Cargando…
QC Production Test for VFAT3 Chips
CMS is planning to install GE1/1 chamber using GEM concept during LS2 as part of the Muon upgrade for High Luminosity Operation at the LHC. The front-end VFAT3 ASIC will be used to read signals from GEM detectors. VFAT3 together with its associated hybrid PCB has been produced in volume. This report...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2687023 |