Cargando…

QC Production Test for VFAT3 Chips

CMS is planning to install GE1/1 chamber using GEM concept during LS2 as part of the Muon upgrade for High Luminosity Operation at the LHC. The front-end VFAT3 ASIC will be used to read signals from GEM detectors. VFAT3 together with its associated hybrid PCB has been produced in volume. This report...

Descripción completa

Detalles Bibliográficos
Autor principal: Chew, Kang Ying
Lenguaje:eng
Publicado: 2019
Materias:
Acceso en línea:http://cds.cern.ch/record/2687023

Ejemplares similares