Cargando…
Time of Arrival calibration of HGCAL prototype modules using charge injection
As of January 2019 the Large Hadron Collider (LHC) has entered its second long shutdown (LS2) and is under maintenance. During Run 2 the collision centre-of-mass energy was 13 TeV with an instantaneous lumi-nosity of ∼ 1 · 1034 cm−2 s−1. This corresponds to an average of 40 simultaneous inelastic in...
Autor principal: | Gaile, Antra |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2687875 |
Ejemplares similares
-
Time Measurement Calibration of HGCAL Prototype Modules
por: Khaldie, Mariam Imad
Publicado: (2019) -
H2 Delay Wire Chamber Efficiency and Electron-Pion Separation in a CMS HGCal Prototype
por: Adi, Wihan
Publicado: (2018) -
Study of the timing performance of the SKIROC2-CMS for the CMS HGCAL
por: Huiberts, Simon Kristian
Publicado: (2017) -
Charged pion energy reconstruction in HGCAL TB prototype using graph neural networks
por: Alpana, Alpana
Publicado: (2023) -
Deep Learning Methods for Particle Reconstruction in the HGCal
por: Arzi, Ofir
Publicado: (2017)