Cargando…

Reliability Considerations for the LHC MKB Re-trigger Upgrade During LS2

An upgrade of the LHC dilution kicker system (MKB) during LS2 foresees the new implementation of a MKB re-trigger mechanism. Immediate re-triggering of the remaining MKB in case of a pre-firing module through the currently existing re-trigger line will be enabled. A decoupling system in the re-trigge...

Descripción completa

Detalles Bibliográficos
Autores principales: Renner, Elisabeth, Bartmann, Wolfgang, Benedikt, Michael, Magnin, Nicolas, Wiesner, Christoph
Lenguaje:eng
Publicado: 2018
Materias:
Acceso en línea:http://cds.cern.ch/record/2690814
_version_ 1780963791362588672
author Renner, Elisabeth
Bartmann, Wolfgang
Benedikt, Michael
Magnin, Nicolas
Wiesner, Christoph
author_facet Renner, Elisabeth
Bartmann, Wolfgang
Benedikt, Michael
Magnin, Nicolas
Wiesner, Christoph
author_sort Renner, Elisabeth
collection CERN
description An upgrade of the LHC dilution kicker system (MKB) during LS2 foresees the new implementation of a MKB re-trigger mechanism. Immediate re-triggering of the remaining MKB in case of a pre-firing module through the currently existing re-trigger line will be enabled. A decoupling system in the re-trigger line is proposed to inhibit asynchronous extraction kicker triggering in case of such self-triggering MKBs. In this report, different design proposals for this decoupling mechanism are evaluated and reliability assessments for the newly introduced system are conducted.
id cern-2690814
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2018
record_format invenio
spelling cern-26908142019-10-01T21:26:22Zhttp://cds.cern.ch/record/2690814engRenner, ElisabethBartmann, WolfgangBenedikt, MichaelMagnin, NicolasWiesner, ChristophReliability Considerations for the LHC MKB Re-trigger Upgrade During LS2Accelerators and Storage RingsAn upgrade of the LHC dilution kicker system (MKB) during LS2 foresees the new implementation of a MKB re-trigger mechanism. Immediate re-triggering of the remaining MKB in case of a pre-firing module through the currently existing re-trigger line will be enabled. A decoupling system in the re-trigger line is proposed to inhibit asynchronous extraction kicker triggering in case of such self-triggering MKBs. In this report, different design proposals for this decoupling mechanism are evaluated and reliability assessments for the newly introduced system are conducted.CERN-ACC-2019-0055oai:cds.cern.ch:26908142018-07-22
spellingShingle Accelerators and Storage Rings
Renner, Elisabeth
Bartmann, Wolfgang
Benedikt, Michael
Magnin, Nicolas
Wiesner, Christoph
Reliability Considerations for the LHC MKB Re-trigger Upgrade During LS2
title Reliability Considerations for the LHC MKB Re-trigger Upgrade During LS2
title_full Reliability Considerations for the LHC MKB Re-trigger Upgrade During LS2
title_fullStr Reliability Considerations for the LHC MKB Re-trigger Upgrade During LS2
title_full_unstemmed Reliability Considerations for the LHC MKB Re-trigger Upgrade During LS2
title_short Reliability Considerations for the LHC MKB Re-trigger Upgrade During LS2
title_sort reliability considerations for the lhc mkb re-trigger upgrade during ls2
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/2690814
work_keys_str_mv AT rennerelisabeth reliabilityconsiderationsforthelhcmkbretriggerupgradeduringls2
AT bartmannwolfgang reliabilityconsiderationsforthelhcmkbretriggerupgradeduringls2
AT benediktmichael reliabilityconsiderationsforthelhcmkbretriggerupgradeduringls2
AT magninnicolas reliabilityconsiderationsforthelhcmkbretriggerupgradeduringls2
AT wiesnerchristoph reliabilityconsiderationsforthelhcmkbretriggerupgradeduringls2