Reliability Considerations for the LHC MKB Re-trigger Upgrade During LS2
An upgrade of the LHC dilution kicker system (MKB) during LS2 foresees the new implementation of a MKB re-trigger mechanism. Immediate re-triggering of the remaining MKB in case of a pre-firing module through the currently existing re-trigger line will be enabled. A decoupling system in the re-trigge...
Autores principales: | , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2690814 |
_version_ | 1780963791362588672 |
---|---|
author | Renner, Elisabeth Bartmann, Wolfgang Benedikt, Michael Magnin, Nicolas Wiesner, Christoph |
author_facet | Renner, Elisabeth Bartmann, Wolfgang Benedikt, Michael Magnin, Nicolas Wiesner, Christoph |
author_sort | Renner, Elisabeth |
collection | CERN |
description | An upgrade of the LHC dilution kicker system (MKB) during LS2 foresees the new implementation of a MKB re-trigger mechanism. Immediate re-triggering of the remaining MKB in case of a pre-firing module through the currently existing re-trigger line will be enabled. A decoupling system in the re-trigger line is proposed to inhibit asynchronous extraction kicker triggering in case of such self-triggering MKBs. In this report, different design proposals for this decoupling mechanism are evaluated and reliability assessments for the newly introduced system are conducted. |
id | cern-2690814 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2018 |
record_format | invenio |
spelling | cern-26908142019-10-01T21:26:22Zhttp://cds.cern.ch/record/2690814engRenner, ElisabethBartmann, WolfgangBenedikt, MichaelMagnin, NicolasWiesner, ChristophReliability Considerations for the LHC MKB Re-trigger Upgrade During LS2Accelerators and Storage RingsAn upgrade of the LHC dilution kicker system (MKB) during LS2 foresees the new implementation of a MKB re-trigger mechanism. Immediate re-triggering of the remaining MKB in case of a pre-firing module through the currently existing re-trigger line will be enabled. A decoupling system in the re-trigger line is proposed to inhibit asynchronous extraction kicker triggering in case of such self-triggering MKBs. In this report, different design proposals for this decoupling mechanism are evaluated and reliability assessments for the newly introduced system are conducted.CERN-ACC-2019-0055oai:cds.cern.ch:26908142018-07-22 |
spellingShingle | Accelerators and Storage Rings Renner, Elisabeth Bartmann, Wolfgang Benedikt, Michael Magnin, Nicolas Wiesner, Christoph Reliability Considerations for the LHC MKB Re-trigger Upgrade During LS2 |
title | Reliability Considerations for the LHC MKB Re-trigger Upgrade During LS2 |
title_full | Reliability Considerations for the LHC MKB Re-trigger Upgrade During LS2 |
title_fullStr | Reliability Considerations for the LHC MKB Re-trigger Upgrade During LS2 |
title_full_unstemmed | Reliability Considerations for the LHC MKB Re-trigger Upgrade During LS2 |
title_short | Reliability Considerations for the LHC MKB Re-trigger Upgrade During LS2 |
title_sort | reliability considerations for the lhc mkb re-trigger upgrade during ls2 |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/2690814 |
work_keys_str_mv | AT rennerelisabeth reliabilityconsiderationsforthelhcmkbretriggerupgradeduringls2 AT bartmannwolfgang reliabilityconsiderationsforthelhcmkbretriggerupgradeduringls2 AT benediktmichael reliabilityconsiderationsforthelhcmkbretriggerupgradeduringls2 AT magninnicolas reliabilityconsiderationsforthelhcmkbretriggerupgradeduringls2 AT wiesnerchristoph reliabilityconsiderationsforthelhcmkbretriggerupgradeduringls2 |