Cargando…
The BIS78 Pad trigger board for the Phase-I Upgrade of the Level-1 Muon Trigger of the ATLAS experiment at LHC
The Phase-I Level-1 Muon Trigger of the ATLAS Experiment receives inputs from the Resistive Plate Chamber (RPC) detector in the barrel region and from the Thin Gap Chamber (TGC), the BIS78 RPC and the New Small Wheel (NSW) detectors in the endcap region. It undergoes an intensive upgrade programme t...
Autor principal: | Loffredo, Salvatore |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2698602 |
Ejemplares similares
-
The BIS78 Pad trigger board for the Phase-I Upgrade of the Level-1 Muon Trigger of the ATLAS experiment at LHC
por: Loffredo, Salvatore
Publicado: (2019) -
Upgrade of the ATLAS Muon Trigger for the HL-LHC
por: Cieri, Davide, et al.
Publicado: (2020) -
Upgrade of the ATLAS Muon Barrel Trigger for HL-LHC.
por: Biondi, Silvia
Publicado: (2015) -
Upgrade of the ATLAS Muon Barrel Trigger for HL-LHC
por: Romano, Marino, et al.
Publicado: (2015) -
Performance of the ATLAS Muon Trigger and Phase-1 Upgrade of Level-1 Endcap Muon Trigger
por: Mizukami, Atsushi, et al.
Publicado: (2017)