Cargando…

LHC-ATLAS Phase-1 upgrade Firmware validation for real time digital processing for new trigger readout system of the Liquid Argon calorimeter

LHC ATLAS Run3 experiment will start from 2021 with higher instantaneous luminosity. ATLAS experiment uses two staged trigger system, the first trigger system is based on hardware, and the second is performed with PC farm. With two staged trigger system, trigger rate can be suppressed to 1KHz from b...

Descripción completa

Detalles Bibliográficos
Autor principal: Oishi, Reiyo
Lenguaje:eng
Publicado: 2019
Materias:
Acceso en línea:http://cds.cern.ch/record/2702603
_version_ 1780964554052730880
author Oishi, Reiyo
author_facet Oishi, Reiyo
author_sort Oishi, Reiyo
collection CERN
description LHC ATLAS Run3 experiment will start from 2021 with higher instantaneous luminosity. ATLAS experiment uses two staged trigger system, the first trigger system is based on hardware, and the second is performed with PC farm. With two staged trigger system, trigger rate can be suppressed to 1KHz from bunch crossing rate of 40MHz. In order to improve trigger performance under high luminosity and high energy condition, we will readout 10 times more finely segment, so-called supercell, with new trigger readout system. This new system requires high performance ATCA mezzanine card, so-called LATOME board, with Intel Arria-10 FPGA. LATOME firmware has several blocks. User Code block, one of main block, calculates deposited energy from 40 MHz sampling 12 bits ADC by using DSP blocks which multiply 14 bits coefficients with a latency of 125 ns. User Code has some modules. About half of them connect to IP bus controller, and which can be read out register contents from FPGA directly. Other modules are connected to a monitoring readout path, which can extract data contents in conjunction with trigger signals. User Code firmware has beed constructed and currently it is under detailed validation. Simulation base User Code verification scheme has been built up based on Universal VHDL/Verilog Verification Methodology (UVVM), which can set up an automatic validation procedure. Also, on-board validation scheme is under development with appropriate readout system. In the presentation, we summarize simulation based firmware verification, and result of on-board validation.
id cern-2702603
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2019
record_format invenio
spelling cern-27026032019-11-25T22:59:03Zhttp://cds.cern.ch/record/2702603engOishi, ReiyoLHC-ATLAS Phase-1 upgrade Firmware validation for real time digital processing for new trigger readout system of the Liquid Argon calorimeterParticle Physics - ExperimentLHC ATLAS Run3 experiment will start from 2021 with higher instantaneous luminosity. ATLAS experiment uses two staged trigger system, the first trigger system is based on hardware, and the second is performed with PC farm. With two staged trigger system, trigger rate can be suppressed to 1KHz from bunch crossing rate of 40MHz. In order to improve trigger performance under high luminosity and high energy condition, we will readout 10 times more finely segment, so-called supercell, with new trigger readout system. This new system requires high performance ATCA mezzanine card, so-called LATOME board, with Intel Arria-10 FPGA. LATOME firmware has several blocks. User Code block, one of main block, calculates deposited energy from 40 MHz sampling 12 bits ADC by using DSP blocks which multiply 14 bits coefficients with a latency of 125 ns. User Code has some modules. About half of them connect to IP bus controller, and which can be read out register contents from FPGA directly. Other modules are connected to a monitoring readout path, which can extract data contents in conjunction with trigger signals. User Code firmware has beed constructed and currently it is under detailed validation. Simulation base User Code verification scheme has been built up based on Universal VHDL/Verilog Verification Methodology (UVVM), which can set up an automatic validation procedure. Also, on-board validation scheme is under development with appropriate readout system. In the presentation, we summarize simulation based firmware verification, and result of on-board validation.ATL-LARG-SLIDE-2019-861oai:cds.cern.ch:27026032019-11-25
spellingShingle Particle Physics - Experiment
Oishi, Reiyo
LHC-ATLAS Phase-1 upgrade Firmware validation for real time digital processing for new trigger readout system of the Liquid Argon calorimeter
title LHC-ATLAS Phase-1 upgrade Firmware validation for real time digital processing for new trigger readout system of the Liquid Argon calorimeter
title_full LHC-ATLAS Phase-1 upgrade Firmware validation for real time digital processing for new trigger readout system of the Liquid Argon calorimeter
title_fullStr LHC-ATLAS Phase-1 upgrade Firmware validation for real time digital processing for new trigger readout system of the Liquid Argon calorimeter
title_full_unstemmed LHC-ATLAS Phase-1 upgrade Firmware validation for real time digital processing for new trigger readout system of the Liquid Argon calorimeter
title_short LHC-ATLAS Phase-1 upgrade Firmware validation for real time digital processing for new trigger readout system of the Liquid Argon calorimeter
title_sort lhc-atlas phase-1 upgrade firmware validation for real time digital processing for new trigger readout system of the liquid argon calorimeter
topic Particle Physics - Experiment
url http://cds.cern.ch/record/2702603
work_keys_str_mv AT oishireiyo lhcatlasphase1upgradefirmwarevalidationforrealtimedigitalprocessingfornewtriggerreadoutsystemoftheliquidargoncalorimeter