Cargando…
New LLRF capabilities and beam results for the second year of ELENA’s commissioning
CERN’s Extra Low ENergy Antiproton (ELENA) ring underwent its second full year of beam commissioning in 2018. The commissioning was very successful, although delayed by recurrent lack of beam availability from the H- source as well as from the Antiproton Decelerator (AD) ring. Major achievements of...
Autores principales: | Angoletta, Maria Elena, Jaussi, Michael, Molendijk, John |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2703432 |
Ejemplares similares
-
LLRF beam results on the first year of ELENA’s commissioning with beam
por: Angoletta, Maria Elena, et al.
Publicado: (2018) -
Commissioning the New LLRF System of the CERN PS Booster
por: Albright, Simon, et al.
Publicado: (2022) -
Initial longitudinal diagnostics for ELENA’s commissioning
por: Angoletta, Maria Elena, et al.
Publicado: (2019) -
ELENA Commissioning
por: Gamba, Davide, et al.
Publicado: (2020) -
Initial Beam Results of CERN ELENA's Digital Low-Level RF System
por: Angoletta, Maria Elena, et al.
Publicado: (2017)