Cargando…

MD2202: compensating long-range beam-beam effectin the LHC using DC wires

his note summarizes the program of the LHC Machine Development to assess the potential and limits of the long-range beam-beam compensators held in 2017 (MD2202). Two compensator prototypes were installed in the machine during the EYETS16-17 and the first evidence of compensation were observed during...

Descripción completa

Detalles Bibliográficos
Autores principales: Sterbini, Guido, Amorim, David, Arduini, Gianluigi, Bartosik, Hannes, Bruce, Roderik, Buffat, Xavier, Carver, Lee Robert, Cattenoz, Gregory, Effinger, Ewald, Fartoukh, Stephane, Fitterer, Miriam, Fuster Martinez, Nuria, Gasior, Marek, Gonzalez Berges, Manuel, Gorzawski, Arkadiusz, Hemelsoet, Georges-Henry, Hostettler, Michi, Iadarola, Giovanni, Jones, Rhodri, Kaltchev, Dobrin, Karastathis, Nikos, Kostoglou, Sofia, Lamas Garcia, Inigo, Levens, Tom, Levichev, Alexey, Medina Medrano, Luis Eduardo, Mirarchi, Daniele, Olexa, Jakub, Papadopoulou, Parthena Stefania, Papaphilippou, Yannis, Pellegrini, Dario, Pojer, Mirko, Ponce, Laurette, Poyet, Axel, Redaelli, Stefano, Rossi, Adriana, Salvachua Ferrando, Belen Maria, Schmickler, Hermann, Schmidt, Frank, Skoufaris, Kyriacos, Solfaroli Camillocci, Matteo, Tomas Garcia, Rogelio, Trad, Georges, Valishev, Alexander, Valuch, Daniel, Xu, Chen, Zamantzas, Christos, Zisopoulos, Panagiotis
Lenguaje:eng
Publicado: 2019
Materias:
Acceso en línea:http://cds.cern.ch/record/2703495
Descripción
Sumario:his note summarizes the program of the LHC Machine Development to assess the potential and limits of the long-range beam-beam compensators held in 2017 (MD2202). Two compensator prototypes were installed in the machine during the EYETS16-17 and the first evidence of compensation were observed during the MD block 1 (FILLS 5898 and 5900, 9 h assigned on 1st July 2017).This study was also scheduled for the MD block 3 but could not be performed due to the machine unavailability (9 h assigned, 2 h available but unfortunately not exploitable for measurements). In MD block 4 an additional slot was scheduled (FILLS 6434 and 6435, 10 h on 29th November 2017)