_version_ 1780964656807936000
author Ahdida, C.C.
Arduini, G.
Arnalich, A.
Avigni, P.
Bardou, F.
Battistin, M.
Bauche, J.
Bianchi, L.
Brugger, M.
Descarrega, J. Busom
Calviani, M.
Espadanal, J. Canhoto
Casolino, M.
Colonna, N.
Dougherty, L.
Dutheil, Y.
Fornasiere, E.
Ximenes, R. Franqueira
Fraser, M.A.
Alia, R. Garcia
Gatignon, L.
Gall, J.
Gilardoni, S.
Goddard, B.
Grenard, J-L.
Grenier, D.
Guinchard, M.
Hessler, C.
Jacobsson, R.
Kain, V.
Kershaw, K.
Platia, E. Koukovini
Lamont, M.
Sola, E. Lopez
Marsh, S.
Ruiz, J.M. Martin
Morton, R.
Muttoni, Y.
Ninin, P.
Osborne, J.A.
Marcone, A. Perillo
Prieto, J. Prieto
Riffaud, B.
Galan, F. Sanchez
Diaz, P. San-tos
Schadegg, S.
Sgobba, S.
Stoel, L.
Martin, C. Torregrosa
Vincke, Heinz
Vincke, Helmut
Velotti, F.M.
Vlachoudis, V.
Vojtyla, P.
Wijnands, T.
Williams, O.
author_facet Ahdida, C.C.
Arduini, G.
Arnalich, A.
Avigni, P.
Bardou, F.
Battistin, M.
Bauche, J.
Bianchi, L.
Brugger, M.
Descarrega, J. Busom
Calviani, M.
Espadanal, J. Canhoto
Casolino, M.
Colonna, N.
Dougherty, L.
Dutheil, Y.
Fornasiere, E.
Ximenes, R. Franqueira
Fraser, M.A.
Alia, R. Garcia
Gatignon, L.
Gall, J.
Gilardoni, S.
Goddard, B.
Grenard, J-L.
Grenier, D.
Guinchard, M.
Hessler, C.
Jacobsson, R.
Kain, V.
Kershaw, K.
Platia, E. Koukovini
Lamont, M.
Sola, E. Lopez
Marsh, S.
Ruiz, J.M. Martin
Morton, R.
Muttoni, Y.
Ninin, P.
Osborne, J.A.
Marcone, A. Perillo
Prieto, J. Prieto
Riffaud, B.
Galan, F. Sanchez
Diaz, P. San-tos
Schadegg, S.
Sgobba, S.
Stoel, L.
Martin, C. Torregrosa
Vincke, Heinz
Vincke, Helmut
Velotti, F.M.
Vlachoudis, V.
Vojtyla, P.
Wijnands, T.
Williams, O.
author_sort Ahdida, C.C.
collection CERN
description The proposed Beam Dump Facility (BDF) is foreseen to be located in the North Area of the Super Proton Synchrotron (SPS). It is designed to be able to serve both beam-dump-like and fixed-target experiments. The SPS and the new facility would offer unique possibilities to enter a new era of exploration at the intensity frontier. Possible options include searches for very weakly interacting particles predicted by Hidden Sector models, and flavour physics measurements. Following the first evaluation of the BDF in 2014–2016, CERN management launched a Comprehensive Design Study over three years for the BDF. The BDF study team has executed an in-depth feasibility study of proton delivery to target, the target complex, and the underground experimental area, including prototyping of key subsystems and evaluations of radiological aspects and safety. A first iteration of detailed integration and civil engineering studies has been performed to produce a realistic schedule and cost. This document gives a detailed overview of the proposed facility together with the results of the in-depth studies, and draws up a road map and project plan for a three years Technical Design Report phase and a five–six years construction phase.
id cern-2703984
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2020
record_format invenio
spelling cern-27039842022-01-30T09:56:55Zdoi:10.23731/CYRM-2020-002http://cds.cern.ch/record/2703984engAhdida, C.C.Arduini, G.Arnalich, A.Avigni, P.Bardou, F.Battistin, M.Bauche, J.Bianchi, L.Brugger, M.Descarrega, J. BusomCalviani, M.Espadanal, J. CanhotoCasolino, M.Colonna, N.Dougherty, L.Dutheil, Y.Fornasiere, E.Ximenes, R. FranqueiraFraser, M.A.Alia, R. GarciaGatignon, L.Gall, J.Gilardoni, S.Goddard, B.Grenard, J-L.Grenier, D.Guinchard, M.Hessler, C.Jacobsson, R.Kain, V.Kershaw, K.Platia, E. KoukoviniLamont, M.Sola, E. LopezMarsh, S.Ruiz, J.M. MartinMorton, R.Muttoni, Y.Ninin, P.Osborne, J.A.Marcone, A. PerilloPrieto, J. PrietoRiffaud, B.Galan, F. SanchezDiaz, P. San-tosSchadegg, S.Sgobba, S.Stoel, L.Martin, C. TorregrosaVincke, HeinzVincke, HelmutVelotti, F.M.Vlachoudis, V.Vojtyla, P.Wijnands, T.Williams, O.SPS Beam Dump Facility - Comprehensive Design StudyAccelerators and Storage Ringsphysics.acc-phThe proposed Beam Dump Facility (BDF) is foreseen to be located in the North Area of the Super Proton Synchrotron (SPS). It is designed to be able to serve both beam-dump-like and fixed-target experiments. The SPS and the new facility would offer unique possibilities to enter a new era of exploration at the intensity frontier. Possible options include searches for very weakly interacting particles predicted by Hidden Sector models, and flavour physics measurements. Following the first evaluation of the BDF in 2014–2016, CERN management launched a Comprehensive Design Study over three years for the BDF. The BDF study team has executed an in-depth feasibility study of proton delivery to target, the target complex, and the underground experimental area, including prototyping of key subsystems and evaluations of radiological aspects and safety. A first iteration of detailed integration and civil engineering studies has been performed to produce a realistic schedule and cost. This document gives a detailed overview of the proposed facility together with the results of the in-depth studies, and draws up a road map and project plan for a three years Technical Design Report phase and a five–six years construction phase.The proposed Beam Dump Facility (BDF) is foreseen to be located in the North Area of the Super Proton Synchrotron (SPS). It is designed to be able to serve both beam-dump-like and fixed-target experiments. The SPS and the new facility would offer unique possibilities to enter a new era of exploration at the intensity frontier. Possible options include searches for very weakly interacting particles predicted by Hidden Sector models, and flavour physics measurements. Following the first evaluation of the BDF in 2014–2016, CERN management launched a Comprehensive Design Study over three years for the BDF. The BDF study team has executed an in-depth feasibility study of proton delivery to target, the target complex, and the underground experimental area, including prototyping of key subsystems and evaluations of radiological aspects and safety. A first iteration of detailed integration and civil engineering studies has been performed to produce a realistic schedule and cost. This document gives a detailed overview of the proposed facility together with the results of the in-depth studies, and draws up a road map and project plan for a three years Technical Design Report phase and a five–six years construction phase.arXiv:1912.06356CERN-PBC-REPORT-2019-005CERN-2020-002oai:cds.cern.ch:27039842020
spellingShingle Accelerators and Storage Rings
physics.acc-ph
Ahdida, C.C.
Arduini, G.
Arnalich, A.
Avigni, P.
Bardou, F.
Battistin, M.
Bauche, J.
Bianchi, L.
Brugger, M.
Descarrega, J. Busom
Calviani, M.
Espadanal, J. Canhoto
Casolino, M.
Colonna, N.
Dougherty, L.
Dutheil, Y.
Fornasiere, E.
Ximenes, R. Franqueira
Fraser, M.A.
Alia, R. Garcia
Gatignon, L.
Gall, J.
Gilardoni, S.
Goddard, B.
Grenard, J-L.
Grenier, D.
Guinchard, M.
Hessler, C.
Jacobsson, R.
Kain, V.
Kershaw, K.
Platia, E. Koukovini
Lamont, M.
Sola, E. Lopez
Marsh, S.
Ruiz, J.M. Martin
Morton, R.
Muttoni, Y.
Ninin, P.
Osborne, J.A.
Marcone, A. Perillo
Prieto, J. Prieto
Riffaud, B.
Galan, F. Sanchez
Diaz, P. San-tos
Schadegg, S.
Sgobba, S.
Stoel, L.
Martin, C. Torregrosa
Vincke, Heinz
Vincke, Helmut
Velotti, F.M.
Vlachoudis, V.
Vojtyla, P.
Wijnands, T.
Williams, O.
SPS Beam Dump Facility - Comprehensive Design Study
title SPS Beam Dump Facility - Comprehensive Design Study
title_full SPS Beam Dump Facility - Comprehensive Design Study
title_fullStr SPS Beam Dump Facility - Comprehensive Design Study
title_full_unstemmed SPS Beam Dump Facility - Comprehensive Design Study
title_short SPS Beam Dump Facility - Comprehensive Design Study
title_sort sps beam dump facility - comprehensive design study
topic Accelerators and Storage Rings
physics.acc-ph
url https://dx.doi.org/10.23731/CYRM-2020-002
http://cds.cern.ch/record/2703984
work_keys_str_mv AT ahdidacc spsbeamdumpfacilitycomprehensivedesignstudy
AT arduinig spsbeamdumpfacilitycomprehensivedesignstudy
AT arnalicha spsbeamdumpfacilitycomprehensivedesignstudy
AT avignip spsbeamdumpfacilitycomprehensivedesignstudy
AT bardouf spsbeamdumpfacilitycomprehensivedesignstudy
AT battistinm spsbeamdumpfacilitycomprehensivedesignstudy
AT bauchej spsbeamdumpfacilitycomprehensivedesignstudy
AT bianchil spsbeamdumpfacilitycomprehensivedesignstudy
AT bruggerm spsbeamdumpfacilitycomprehensivedesignstudy
AT descarregajbusom spsbeamdumpfacilitycomprehensivedesignstudy
AT calvianim spsbeamdumpfacilitycomprehensivedesignstudy
AT espadanaljcanhoto spsbeamdumpfacilitycomprehensivedesignstudy
AT casolinom spsbeamdumpfacilitycomprehensivedesignstudy
AT colonnan spsbeamdumpfacilitycomprehensivedesignstudy
AT doughertyl spsbeamdumpfacilitycomprehensivedesignstudy
AT dutheily spsbeamdumpfacilitycomprehensivedesignstudy
AT fornasieree spsbeamdumpfacilitycomprehensivedesignstudy
AT ximenesrfranqueira spsbeamdumpfacilitycomprehensivedesignstudy
AT fraserma spsbeamdumpfacilitycomprehensivedesignstudy
AT aliargarcia spsbeamdumpfacilitycomprehensivedesignstudy
AT gatignonl spsbeamdumpfacilitycomprehensivedesignstudy
AT gallj spsbeamdumpfacilitycomprehensivedesignstudy
AT gilardonis spsbeamdumpfacilitycomprehensivedesignstudy
AT goddardb spsbeamdumpfacilitycomprehensivedesignstudy
AT grenardjl spsbeamdumpfacilitycomprehensivedesignstudy
AT grenierd spsbeamdumpfacilitycomprehensivedesignstudy
AT guinchardm spsbeamdumpfacilitycomprehensivedesignstudy
AT hesslerc spsbeamdumpfacilitycomprehensivedesignstudy
AT jacobssonr spsbeamdumpfacilitycomprehensivedesignstudy
AT kainv spsbeamdumpfacilitycomprehensivedesignstudy
AT kershawk spsbeamdumpfacilitycomprehensivedesignstudy
AT platiaekoukovini spsbeamdumpfacilitycomprehensivedesignstudy
AT lamontm spsbeamdumpfacilitycomprehensivedesignstudy
AT solaelopez spsbeamdumpfacilitycomprehensivedesignstudy
AT marshs spsbeamdumpfacilitycomprehensivedesignstudy
AT ruizjmmartin spsbeamdumpfacilitycomprehensivedesignstudy
AT mortonr spsbeamdumpfacilitycomprehensivedesignstudy
AT muttoniy spsbeamdumpfacilitycomprehensivedesignstudy
AT nininp spsbeamdumpfacilitycomprehensivedesignstudy
AT osborneja spsbeamdumpfacilitycomprehensivedesignstudy
AT marconeaperillo spsbeamdumpfacilitycomprehensivedesignstudy
AT prietojprieto spsbeamdumpfacilitycomprehensivedesignstudy
AT riffaudb spsbeamdumpfacilitycomprehensivedesignstudy
AT galanfsanchez spsbeamdumpfacilitycomprehensivedesignstudy
AT diazpsantos spsbeamdumpfacilitycomprehensivedesignstudy
AT schadeggs spsbeamdumpfacilitycomprehensivedesignstudy
AT sgobbas spsbeamdumpfacilitycomprehensivedesignstudy
AT stoell spsbeamdumpfacilitycomprehensivedesignstudy
AT martinctorregrosa spsbeamdumpfacilitycomprehensivedesignstudy
AT vinckeheinz spsbeamdumpfacilitycomprehensivedesignstudy
AT vinckehelmut spsbeamdumpfacilitycomprehensivedesignstudy
AT velottifm spsbeamdumpfacilitycomprehensivedesignstudy
AT vlachoudisv spsbeamdumpfacilitycomprehensivedesignstudy
AT vojtylap spsbeamdumpfacilitycomprehensivedesignstudy
AT wijnandst spsbeamdumpfacilitycomprehensivedesignstudy
AT williamso spsbeamdumpfacilitycomprehensivedesignstudy