Cargando…
Last bypass cryostat for IP2 collimators installation ready for transport to tunnel
Last (second) bypass cryostat for IP2 (11R2 side) collimators installation ready for transport to the tunnel
Autor principal: | |
---|---|
Publicado: |
2019
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2704594 |
Sumario: | Last (second) bypass cryostat for IP2 (11R2 side) collimators installation ready for transport to the tunnel |
---|