Last bypass cryostat for IP2 collimators installation ready for transport to tunnel
Last (second) bypass cryostat for IP2 (11R2 side) collimators installation ready for transport to the tunnel
Autor principal: | Struik, Michael |
---|---|
Publicado: |
2019
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2704594 |
Ejemplares similares
-
Installation of two HL-LHC Connection Cryostats in 11L2 and 11R2
por: Struik, Michael, et al.
Publicado: (2019) -
Installation of new crystal collimators in the LHC tunnel at Point 7
por: Brice, Maximilien
Publicado: (2023) -
Target Collimator Long Dispersion suppressor (TCLD) installation near ALICE in the tunnel
por: Brice, Maximilien
Publicado: (2020) -
HL LHC - test station vertical cryostat installation
por: Brice, Maximilien
Publicado: (2016) -
Collimator P1 Installation 2018
por: Brice, Maximilien, et al.
Publicado: (2018)