Cargando…
LHC MD2930: Asynchronous Beam Dump Test with Bunched Beam
This note summarises the results of LHC Machine Development (MD) 2930, which studied the beam-loss behaviour during asynchronous beam dumps at 450 GeV and at 6.5 TeV using bunched beam in the abort gap. The MD consisted of three main parts. First, single pilot bunches were injected into the abort ga...
Autores principales: | Wiesner, Christoph, Bartmann, Wolfgang, Bracco, Chiara, Carlier, Etienne, Fraser, Matthew Alexander, Hessler, Christoph, Lechner, Anton, Magnin, Nicolas, Renner, Elisabeth, Wollmann, Daniel, Frankl, Matthias Immanuel |
---|---|
Lenguaje: | eng |
Publicado: |
2020
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2706605 |
Ejemplares similares
-
LHC MD4044: Asynchronous Beam Dump Test with Bunched Beam at Flat Top
por: Wiesner, Christoph, et al.
Publicado: (2020) -
Asynchronous Beam Dump Tests at LHC
por: Wiesner, Christoph, et al.
Publicado: (2018) -
LHC MD 2401: Beam-Based Measurement of the MKD Rise Time
por: Wiesner, Christoph, et al.
Publicado: (2018) -
Energy Deposition Studies and Analysis of the Quench Behavior in the Case of Asynchronous Dumps During 6.5 TeV LHC Proton Beam Operation
por: Frankl, Matthias, et al.
Publicado: (2018) -
LHC Beam Dump Performance in View of the High Luminosity Upgrade
por: Wiesner, Christoph, et al.
Publicado: (2017)