Cargando…
Commissioning and simulation of CHROMIE, a high-rate test beam telescope
The upgrade of the LHC to the High-Luminosity LHC (HL-LHC) is expected to increase the current instantaneous luminosity by a factor of 5 to 7, providing the opportunity to study rare processes and measure precisely the standard model parameters. To cope with the increase in pile-up (up to 200), part...
Autor principal: | Asenov, P. |
---|---|
Lenguaje: | eng |
Publicado: |
2020
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1088/1748-0221/15/02/C02003 http://cds.cern.ch/record/2708937 |
Ejemplares similares
-
Commissioning and simulation of CHROMIE, a high-rate test beam telescope
por: Asenov, Patrick Asenov
Publicado: (2019) -
Summary and Conclusions of the 'JRA Beam Telescope 2025'-Forum at the 6th Beam Telescopes and Test Beams Workshop
por: Dreyling-Eschweiler, J., et al.
Publicado: (2018) -
The MuPix Telescope: A Thin, high Rate Tracking Telescope
por: Augustin, H., et al.
Publicado: (2016) -
Background study for the pn-CCD detector of CERN Axion Solar Telescope
por: Cebrian, S., et al.
Publicado: (2007) -
Commissioning of the ATLAS Tracking Detector
por: Martin, Franck F
Publicado: (2008)