Cargando…

Impedance Compliance Testing for the PS Internal Beam Dump

The performance of the accelerators at CERN critically depends on the overall beam coupling impedance of the individual elements. Bench measurements of the electromagnetic behaviour of existing and new pieces of equipment are therefore regularly carried out prior to the installation in the accelerat...

Descripción completa

Detalles Bibliográficos
Autores principales: Jhugroo, Dhiren, Popovic, Branko Kosta, Vollinger, Christine
Lenguaje:eng
Publicado: 2020
Materias:
Acceso en línea:http://cds.cern.ch/record/2717700
_version_ 1780965625061965824
author Jhugroo, Dhiren
Popovic, Branko Kosta
Vollinger, Christine
author_facet Jhugroo, Dhiren
Popovic, Branko Kosta
Vollinger, Christine
author_sort Jhugroo, Dhiren
collection CERN
description The performance of the accelerators at CERN critically depends on the overall beam coupling impedance of the individual elements. Bench measurements of the electromagnetic behaviour of existing and new pieces of equipment are therefore regularly carried out prior to the installation in the accelerators. This note discusses the measurements carried out on the two new internal beam dumps for the PS. The aim of the measurement is to identify the intrinsic resonances of the device and to compare with the simulated results. This validates the impedance of the built units as predicted by the CST model derived from the CATIA geometry ST0944915.
id cern-2717700
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2020
record_format invenio
spelling cern-27177002023-08-04T20:26:48Zhttp://cds.cern.ch/record/2717700engJhugroo, DhirenPopovic, Branko KostaVollinger, ChristineImpedance Compliance Testing for the PS Internal Beam DumpAccelerators and Storage RingsThe performance of the accelerators at CERN critically depends on the overall beam coupling impedance of the individual elements. Bench measurements of the electromagnetic behaviour of existing and new pieces of equipment are therefore regularly carried out prior to the installation in the accelerators. This note discusses the measurements carried out on the two new internal beam dumps for the PS. The aim of the measurement is to identify the intrinsic resonances of the device and to compare with the simulated results. This validates the impedance of the built units as predicted by the CST model derived from the CATIA geometry ST0944915.CERN-ACC-Note-2020-0028oai:cds.cern.ch:27177002020-05-11
spellingShingle Accelerators and Storage Rings
Jhugroo, Dhiren
Popovic, Branko Kosta
Vollinger, Christine
Impedance Compliance Testing for the PS Internal Beam Dump
title Impedance Compliance Testing for the PS Internal Beam Dump
title_full Impedance Compliance Testing for the PS Internal Beam Dump
title_fullStr Impedance Compliance Testing for the PS Internal Beam Dump
title_full_unstemmed Impedance Compliance Testing for the PS Internal Beam Dump
title_short Impedance Compliance Testing for the PS Internal Beam Dump
title_sort impedance compliance testing for the ps internal beam dump
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/2717700
work_keys_str_mv AT jhugroodhiren impedancecompliancetestingforthepsinternalbeamdump
AT popovicbrankokosta impedancecompliancetestingforthepsinternalbeamdump
AT vollingerchristine impedancecompliancetestingforthepsinternalbeamdump