Cargando…

Intra-bunch feedback system developments at DAFNE

This paper presents history and evolution of the intra-bunch feedback system for circular accelerators. This pro-ject has been presented by John D. Fox (SLAC/Stanford Un.) at the IPAC2010 held in Kyoto. The idea of the pro-posal is to build a flexible and powerful instrument to mit-igate the parasit...

Descripción completa

Detalles Bibliográficos
Autores principales: Drago, Alessandro, Alesini, D., Caschera, S., Gallo, A., Fox, J.D., Cesaratto, J., Dusatko, J., Olsen, J., Rivetta, C., Turgut, O., Hofle, W., Iadarola, G., Li, K., Metral, E., Montesinos, E., Rumolo, G., De Santis, S., Furman, M., Vay, J-L, Tobiyama, M.
Lenguaje:eng
Publicado: CERN 2020
Materias:
Acceso en línea:https://dx.doi.org/10.23732/CYRCP-2020-007.223
http://cds.cern.ch/record/2717910
Descripción
Sumario:This paper presents history and evolution of the intra-bunch feedback system for circular accelerators. This pro-ject has been presented by John D. Fox (SLAC/Stanford Un.) at the IPAC2010 held in Kyoto. The idea of the pro-posal is to build a flexible and powerful instrument to mit-igate the parasitic e-cloud effects on the proton (and poten-tially positron) beams in storage rings. Being a new and ambitious project, the financial issues have been quite im-portant. US LHC Accelerator Research Program (LARP) and other institution funding sources have assured the de-velopment of the design for implementing the feedback in the SPS ring at CERN. Here the intra-bunch feedback sys-tem has been installed and tested in the frame of the LIU (LHC Injector Upgrade) program. After the end of the LARP funding, a possible new inter-esting chance to continue the R&D activity, could be by implementing the system in a lepton storage ring affected by e-cloud effects. For achieving this goal, a possible ex-periment could be carried out in the positron ring of DAFNE at Frascati, Italy. The feasibility of the proposal is evaluated in the following sections. In case of approval of the experiment, indeed the project could be inserted in the DAFNE-TF (DAFNE Test Facility) program that is fore-seen after the 2020 for the following 3-5 years.