Cargando…

Installation of passive absorber mask TCAPM for warm magnet protection

As a part of the consolidation of the warm magnet systems of the betatron cleaning insertion (IR7), one MQW module of the Q5 magnet will be removed from the tunnel. This is planned for LS2 as a part of the mitigation measures to reduce the absorbed dose on warm magnets and increase their lifetime. I...

Descripción completa

Detalles Bibliográficos
Autor principal: Brice, Maximilien
Publicado: 2020
Materias:
Acceso en línea:http://cds.cern.ch/record/2721185
Descripción
Sumario:As a part of the consolidation of the warm magnet systems of the betatron cleaning insertion (IR7), one MQW module of the Q5 magnet will be removed from the tunnel. This is planned for LS2 as a part of the mitigation measures to reduce the absorbed dose on warm magnets and increase their lifetime. In order to ensure adequate protection of the downstream magnets, a new passive absorber TCAPM (Target Collimator Absorber Passive Mask), will be installed.