Cargando…
Installation of passive absorber mask TCAPM for warm magnet protection
As a part of the consolidation of the warm magnet systems of the betatron cleaning insertion (IR7), one MQW module of the Q5 magnet will be removed from the tunnel. This is planned for LS2 as a part of the mitigation measures to reduce the absorbed dose on warm magnets and increase their lifetime. I...
Autor principal: | Brice, Maximilien |
---|---|
Publicado: |
2020
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2721185 |
Ejemplares similares
-
HL-LHC TDIS pre-series - ABSORBERS INSTALLATION
por: Brice, Maximilien, et al.
Publicado: (2019) -
Upgrade of magnets in Hall 867 - Magnets to be installed B157
por: Brice, Maximilien
Publicado: (2019) -
Installation of a new magnet PSB 15l1
por: Maximilien, Brice
Publicado: (2019) -
The new septum and bumper magnets during installation in the PS injection line
por: Brice, Maximilien
Publicado: (2020) -
New Protection System for Quenchs of LHC, with new switches installed
por: Brice, Maximilien, et al.
Publicado: (2019)