Cargando…
Handover of the HL-LHC project in LHC tunnel at Point 5
After 10 years of leadership, Lucio Rossi officially handed over the High Luminosity LHC (HL-LHC) project to Oliver Bruning, the new HL-LHC project leader. On this occasion, the HL-LHC Management invited Fabiola Gianotti, CERN's DG, Frederick Bordry, Director for Accelerators and Technology and...
Autor principal: | |
---|---|
Publicado: |
2020
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2722346 |
_version_ | 1780965889447821312 |
---|---|
author | Hertzog, Samuel Joseph |
author_facet | Hertzog, Samuel Joseph |
author_sort | Hertzog, Samuel Joseph |
collection | CERN |
description | After 10 years of leadership, Lucio Rossi officially handed over the High Luminosity LHC (HL-LHC) project to Oliver Bruning, the new HL-LHC project leader. On this occasion, the HL-LHC Management invited Fabiola Gianotti, CERN's DG, Frederick Bordry, Director for Accelerators and Technology and Lluis Miralles Verge, Head of the SMB Department to visit the new connection between the HL-LHC UPR53 and the LHC tunnel at Point 5 in Cessy, France. The new HL-LHC caverns will be connected to the LHC tunnel during LS2 via emergency exit galleries UPR. During the run 3 the UPR galleries need to be closed off from the HL-LHC galleries. |
id | cern-2722346 |
institution | Organización Europea para la Investigación Nuclear |
publishDate | 2020 |
record_format | invenio |
spelling | cern-27223462021-03-11T11:28:23Zhttp://cds.cern.ch/record/2722346Hertzog, Samuel JosephHandover of the HL-LHC project in LHC tunnel at Point 5PhotolabAfter 10 years of leadership, Lucio Rossi officially handed over the High Luminosity LHC (HL-LHC) project to Oliver Bruning, the new HL-LHC project leader. On this occasion, the HL-LHC Management invited Fabiola Gianotti, CERN's DG, Frederick Bordry, Director for Accelerators and Technology and Lluis Miralles Verge, Head of the SMB Department to visit the new connection between the HL-LHC UPR53 and the LHC tunnel at Point 5 in Cessy, France. The new HL-LHC caverns will be connected to the LHC tunnel during LS2 via emergency exit galleries UPR. During the run 3 the UPR galleries need to be closed off from the HL-LHC galleries.CERN-PHOTO-202006-094oai:cds.cern.ch:27223462020 |
spellingShingle | Photolab Hertzog, Samuel Joseph Handover of the HL-LHC project in LHC tunnel at Point 5 |
title | Handover of the HL-LHC project in LHC tunnel at Point 5 |
title_full | Handover of the HL-LHC project in LHC tunnel at Point 5 |
title_fullStr | Handover of the HL-LHC project in LHC tunnel at Point 5 |
title_full_unstemmed | Handover of the HL-LHC project in LHC tunnel at Point 5 |
title_short | Handover of the HL-LHC project in LHC tunnel at Point 5 |
title_sort | handover of the hl-lhc project in lhc tunnel at point 5 |
topic | Photolab |
url | http://cds.cern.ch/record/2722346 |
work_keys_str_mv | AT hertzogsamueljoseph handoverofthehllhcprojectinlhctunnelatpoint5 |