Cargando…
Installing the new upgraded dumps in their new frames
The new, upgraded dumps (new windows, instrumentation, new support system) will be installed in their new frames, ready for the installation in the UD caverns.
Autor principal: | Brice, Maximilien |
---|---|
Publicado: |
2020
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2729926 |
Ejemplares similares
-
New beam dump in the PS
por: Brice, Maximilien
Publicado: (2020) -
Upgrade of magnets in Hall 867 - Magnets to be installed B157
por: Brice, Maximilien
Publicado: (2019) -
New module installed in CLIC test facility
por: Brice, Maximilien
Publicado: (2015) -
Installation of the new TT2 stripper foil
por: Brice, Maximilien
Publicado: (2022) -
Installation of the new MAPP subdetector at the MoEDAL experiment
por: Brice, Maximilien
Publicado: (2022)