Cargando…

Cooling and Ventilation Studies for the CLIC

The CLiC is composed of a large-scale complex requiring cooling and ventilation infrastructures in surface buildings and in underground tunnels. A conceptual design of these systems has been done throughout 2018 for the 380 GeV accelerator. Two different versions with distinct beam accelerating syst...

Descripción completa

Detalles Bibliográficos
Autores principales: Cabral, Pedro, Nonis, Mauro
Lenguaje:eng
Publicado: 2019
Materias:
Acceso en línea:http://cds.cern.ch/record/2732035
_version_ 1780966707437764608
author Cabral, Pedro
Nonis, Mauro
author_facet Cabral, Pedro
Nonis, Mauro
author_sort Cabral, Pedro
collection CERN
description The CLiC is composed of a large-scale complex requiring cooling and ventilation infrastructures in surface buildings and in underground tunnels. A conceptual design of these systems has been done throughout 2018 for the 380 GeV accelerator. Two different versions with distinct beam accelerating systems were considered. The total cooling required is approximately 160 MW for the drive beam-based machine and 140 MW for the klystron-based machine. The cost of the cooling and ventilation infrastructure is estimated to be approximately 468 MCHF and 419 MCHF respectively.
id cern-2732035
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2019
record_format invenio
spelling cern-27320352023-07-20T15:06:00Zhttp://cds.cern.ch/record/2732035engCabral, PedroNonis, MauroCooling and Ventilation Studies for the CLICAccelerators and Storage RingsThe CLiC is composed of a large-scale complex requiring cooling and ventilation infrastructures in surface buildings and in underground tunnels. A conceptual design of these systems has been done throughout 2018 for the 380 GeV accelerator. Two different versions with distinct beam accelerating systems were considered. The total cooling required is approximately 160 MW for the drive beam-based machine and 140 MW for the klystron-based machine. The cost of the cooling and ventilation infrastructure is estimated to be approximately 468 MCHF and 419 MCHF respectively. CERN-ACC-2020-0025CLIC-Note-1164oai:cds.cern.ch:27320352019-05-01
spellingShingle Accelerators and Storage Rings
Cabral, Pedro
Nonis, Mauro
Cooling and Ventilation Studies for the CLIC
title Cooling and Ventilation Studies for the CLIC
title_full Cooling and Ventilation Studies for the CLIC
title_fullStr Cooling and Ventilation Studies for the CLIC
title_full_unstemmed Cooling and Ventilation Studies for the CLIC
title_short Cooling and Ventilation Studies for the CLIC
title_sort cooling and ventilation studies for the clic
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/2732035
work_keys_str_mv AT cabralpedro coolingandventilationstudiesfortheclic
AT nonismauro coolingandventilationstudiesfortheclic