Cargando…
Cooling and Ventilation Studies for the CLIC
The CLiC is composed of a large-scale complex requiring cooling and ventilation infrastructures in surface buildings and in underground tunnels. A conceptual design of these systems has been done throughout 2018 for the 380 GeV accelerator. Two different versions with distinct beam accelerating syst...
Autores principales: | Cabral, Pedro, Nonis, Mauro |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2732035 |
Ejemplares similares
-
Construction Progress of the Cooling and Ventilation in the LHC Project
por: Nonis, M
Publicado: (2001) -
Simulation Study of Cool-Down of the CLIC Wiggler Magnets
por: Liu, L, et al.
Publicado: (2013) -
Cooling and Vibration in the CLIC Main Accelerating Structure
por: Schnell, Wolfgang
Publicado: (2001) -
Cooling and vibration in the CLIC main accelerating structure
por: Schnell, Wolfgang
Publicado: (2001) -
Cooling and vibration in the CLIC main accelerating structure
por: Schnell, W
Publicado: (2001)