Cargando…
Upgraded LHC beam dump transport in the LHC tunnel
The beam dump is transported from UX65 to its cavern UD62 where the beam dump is located (U = underground and D = dump). Views of the dump as it leaves UX65, its installation in the LHC tunnel, in sector UJ62, and 64) - in the TD tunnel, a transfer tunnel to the beam dump's cavern.
Autor principal: | Fichet, Jacques Herve |
---|---|
Publicado: |
2020
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2734111 |
Ejemplares similares
-
Last shrink fitting operation of the Run 3 LHC beam dump spares
por: Fichet, Jacques Herve
Publicado: (2023) -
Removal of spare LHC beam dumps for LS2 upgrades
por: Ordan, Julien
Publicado: (2020) -
Beams screens for the High-Luminosity LHC
por: Fichet, Jacques Herve
Publicado: (2023) -
Welding process of the LHC beam dumps
por: Brice, Maximilien
Publicado: (2020) -
LHC External Beam Dump (TDE) autopsy
por: Brice, Maximilien
Publicado: (2022)