Cargando…
Final pressure test in the LHC in sector 6-7
Representatives of the Cryogenics group and the DISMAC (Diode Insulation and Superconducting MAgnets Consolidation) project got together at Point 6 of the LHC to mark the final pressure test carried out during LS2 as part of the DISMAC project. The last of the eight pressure tests (one per sector) c...
Autor principal: | Ordan, Julien Marius |
---|---|
Publicado: |
2020
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2742898 |
Ejemplares similares
-
Coldbox installation for HL-LHC crab cavity test in the SPS tunnel (BA6)
por: Ordan, Julien Marius, et al.
Publicado: (2018) -
Superconducting link test bench for the High-Luminosity LHC in SM18
por: Ordan, Julien Marius
Publicado: (2019) -
Crab Cavities Final position YETS 2018
por: Ordan, Julien Marius
Publicado: (2018) -
"Moving out of Academia to the financial sector" Conference by Alumni Office
por: Ordan, Julien Marius
Publicado: (2018) -
Superconducting link being tested in SM18 for the HL-LHC
por: Brice, Maximilien, et al.
Publicado: (2020)