FELIX and the SW ROD: commissioning the new ATLAS readout system

After the current LHC shutdown (2019-2021), the ATLAS experiment will be required to operate in an increasingly harsh collision environment. To maintain physics performance, the ATLAS experiment will undergo a series of upgrades during the shutdown. A key goal of this upgrade is to improve the capac...

Descripción completa

Detalles Bibliográficos
Autor principal: Gottardo, Carlo Alberto
Lenguaje:eng
Publicado: 2020
Materias:
Acceso en línea:http://cds.cern.ch/record/2744566
Descripción
Sumario:After the current LHC shutdown (2019-2021), the ATLAS experiment will be required to operate in an increasingly harsh collision environment. To maintain physics performance, the ATLAS experiment will undergo a series of upgrades during the shutdown. A key goal of this upgrade is to improve the capacity and flexibility of the detector readout system. To this end, the Front-End Link eXchange (FELIX) system was developed as the new interface between the data acquisition; detector control and TTC (Timing, Trigger and Control) systems; and new or updated trigger and detector front-end electronics. FELIX functions as a router between custom serial links from front end ASICs and FPGAs to data collection and processing components via a commodity switched network. The serial links may aggregate many slower links or be a single high bandwidth link. FELIX also forwards the LHC bunch-crossing clock, fixed latency trigger accepts and resets received from the TTC system to front-end electronics. FELIX uses commodity server technology in combination with FPGA-based PCIe I/O cards. FELIX servers run a software routing platform serving data to network clients. Commodity servers connected to FELIX systems via the same network run the new multi-threaded Software Readout Driver (SW ROD) infrastructure for event fragment building, buffering and detector-specific processing to facilitate online selection. This presentation will cover the design of FELIX and the SW ROD and the results of the installation and commissioning activities for the full system in spring and summer 2020.