Cargando…

Installation of LHC's injection for the absorber TDIS at P8

The TDIS (target dump injection segmented) is a machine-protecting device for the LHC equipment, located close to the point at which particles are injected from the Super Proton Synchrotron (SPS). Four months after the installation of the first unit at Point 2 of the LHC in the second and last TDIS...

Descripción completa

Detalles Bibliográficos
Autor principal: Carbajo Perez, David
Publicado: 2020
Materias:
Acceso en línea:http://cds.cern.ch/record/2744978
_version_ 1780968669470261248
author Carbajo Perez, David
author_facet Carbajo Perez, David
author_sort Carbajo Perez, David
collection CERN
description The TDIS (target dump injection segmented) is a machine-protecting device for the LHC equipment, located close to the point at which particles are injected from the Super Proton Synchrotron (SPS). Four months after the installation of the first unit at Point 2 of the LHC in the second and last TDIS is being integrated in the machine at P8. As last time, the equipment has been lowered through P1 into the tunnel and hauled for 3 km on a dedicated trailer to reach its destination. Thanks to the vault handling system specifically mounted for this purpose the TDIS is lifted and displaced laterally before letting it rest on top of its 3 jacks. The cooling circuit has been as well successfully connected to the LHC network and now the final alignment in the machine has to be conducted to allow the coupling to the vacuum line.
id cern-2744978
institution Organización Europea para la Investigación Nuclear
publishDate 2020
record_format invenio
spelling cern-27449782021-01-20T09:50:50Zhttp://cds.cern.ch/record/2744978Carbajo Perez, DavidInstallation of LHC's injection for the absorber TDIS at P8PhotolabThe TDIS (target dump injection segmented) is a machine-protecting device for the LHC equipment, located close to the point at which particles are injected from the Super Proton Synchrotron (SPS). Four months after the installation of the first unit at Point 2 of the LHC in the second and last TDIS is being integrated in the machine at P8. As last time, the equipment has been lowered through P1 into the tunnel and hauled for 3 km on a dedicated trailer to reach its destination. Thanks to the vault handling system specifically mounted for this purpose the TDIS is lifted and displaced laterally before letting it rest on top of its 3 jacks. The cooling circuit has been as well successfully connected to the LHC network and now the final alignment in the machine has to be conducted to allow the coupling to the vacuum line.CERN-PHOTO-202011-157oai:cds.cern.ch:27449782020
spellingShingle Photolab
Carbajo Perez, David
Installation of LHC's injection for the absorber TDIS at P8
title Installation of LHC's injection for the absorber TDIS at P8
title_full Installation of LHC's injection for the absorber TDIS at P8
title_fullStr Installation of LHC's injection for the absorber TDIS at P8
title_full_unstemmed Installation of LHC's injection for the absorber TDIS at P8
title_short Installation of LHC's injection for the absorber TDIS at P8
title_sort installation of lhc's injection for the absorber tdis at p8
topic Photolab
url http://cds.cern.ch/record/2744978
work_keys_str_mv AT carbajoperezdavid installationoflhcsinjectionfortheabsorbertdisatp8