Installation of the last two secondary collimators (TCSPM) at Point 7
The last two Low-Impedance Secondary Collimators (TCSPM) were installed in the LHC tunnel, located in IR7, during the Long Shutdown 2 (LS2). The baseline upgrade of the LHC collimation system foreseen by the high luminosity (HL-LHC) project replaced all the TCSGs (another type of collimator) with ne...
Autor principal: | |
---|---|
Publicado: |
2020
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2747212 |
Sumario: | The last two Low-Impedance Secondary Collimators (TCSPM) were installed in the LHC tunnel, located in IR7, during the Long Shutdown 2 (LS2). The baseline upgrade of the LHC collimation system foreseen by the high luminosity (HL-LHC) project replaced all the TCSGs (another type of collimator) with new ones (TCSPM) to reduce impedance and ensure with sufficient margin the stability of brighter HL-LHC beams. |
---|