Cargando…

Installation of the last two secondary collimators (TCSPM) at Point 7

The last two Low-Impedance Secondary Collimators (TCSPM) were installed in the LHC tunnel, located in IR7, during the Long Shutdown 2 (LS2). The baseline upgrade of the LHC collimation system foreseen by the high luminosity (HL-LHC) project replaced all the TCSGs (another type of collimator) with ne...

Descripción completa

Detalles Bibliográficos
Autor principal: Bahamonde Castro, Cristina
Publicado: 2020
Materias:
Acceso en línea:http://cds.cern.ch/record/2747212