Cargando…
Installation of the last two secondary collimators (TCSPM) at Point 7
The last two Low-Impedance Secondary Collimators (TCSPM) were installed in the LHC tunnel, located in IR7, during the Long Shutdown 2 (LS2). The baseline upgrade of the LHC collimation system foreseen by the high luminosity (HL-LHC) project replaced all the TCSGs (another type of collimator) with ne...
Autor principal: | Bahamonde Castro, Cristina |
---|---|
Publicado: |
2020
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2747212 |
Ejemplares similares
-
MD2193 – Impedance Measurements of the TCSPM Prototype Collimator
por: Amorim, David, et al.
Publicado: (2021) -
CBI Fusion Point 2022 - Last visit and Final Gala
por: Poulaillon, Jimmy
Publicado: (2022) -
Robotics remote handling of a collimator
por: Grenard, Jean-Louis
Publicado: (2013) -
VAX support installation
por: Luque, Maria
Publicado: (2021) -
Visit to the HL-LHC collimators prototypes under production
por: Garcia Obrero, Irene
Publicado: (2023)