Cargando…
CMS beam pipe installation
Installation of the new beam pipe, at the heart of the detector, inside the CMS experiment. This fragile, 36-m-long component, in which the LHC beams collide at the Interaction Point (IP), is one of the last elements of the experiment to be installed before closing the detector at Point 5 of the LHC...
Autor principal: | Fichet, Jacques Herve |
---|---|
Publicado: |
2021
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2764445 |
Ejemplares similares
-
Installation of ABB smart sensors on CERN's cooling and ventilation system
por: Fichet, Jacques Herve
Publicado: (2022) -
Installation of the Zero Degree Calorimeter (ZDC) in the LHC P1, ATLAS
por: Fichet, Jacques Herve
Publicado: (2023) -
CMS rotating shielding around beam pipe
por: Hertzog, Samuel Joseph
Publicado: (2021) -
Beam Pipe near the central part of CMS Detetector
por: Brice, Maximilien
Publicado: (2008) -
First stable beams 2016
por: Fichet, Jacques Herve
Publicado: (2016)