Cargando…
Renovation of the AD Target room and target station
Total renovation of the Anti-proton Decelerator (AD) Target room and in particular of the target station. The target station being a remote controlled movement system to swap targets of different composition. This photo collection shows the tests on the surface before the definitive installation of...
Autor principal: | Ordan, Julien Marius |
---|---|
Publicado: |
2021
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2764922 |
Ejemplares similares
-
Transfer of the AD Target station from the test rig to the Target Room
por: Brice, Maximilien, et al.
Publicado: (2021) -
The renovated fire station
por: Brice, Maximilien
Publicado: (2021) -
Office of the theory before renovation
por: Brice, Maximilien, et al.
Publicado: (2017) -
Different perspectives of the Building 157 before renovation
por: Ordan, Julien Marius
Publicado: (2018) -
Cooling station of the third generation n_TOF spallation target
por: Ordan, Julien Marius
Publicado: (2021)