The Phase-2 Upgrade of the CMS Data Acquisition

<!--HTML-->The High Luminosity LHC (HL-LHC), will start operating in 2027 after the third Long Shutdown (LS3), and is designed to provide an ultimate instantaneous luminosity of $7.5\times10^{34}$ cm$^{-2}$ s$^{-1}$, at the price of extreme pileup of up to 200 interactions per crossing. The nu...

Descripción completa

Detalles Bibliográficos
Autor principal: Meschi, Emilio
Lenguaje:eng
Publicado: 2021
Materias:
Acceso en línea:http://cds.cern.ch/record/2767571
_version_ 1780971312417603584
author Meschi, Emilio
author_facet Meschi, Emilio
author_sort Meschi, Emilio
collection CERN
description <!--HTML-->The High Luminosity LHC (HL-LHC), will start operating in 2027 after the third Long Shutdown (LS3), and is designed to provide an ultimate instantaneous luminosity of $7.5\times10^{34}$ cm$^{-2}$ s$^{-1}$, at the price of extreme pileup of up to 200 interactions per crossing. The number of overlapping interactions in HL-LHC collisions, their density, and the resulting intense radiation environment, warrant an almost complete upgrade of the CMS detector. The upgraded CMS detector will be read out by approximately fifty thousand high-speed front-end optical links at an unprecedented data rate of up to 80~Tb/s, for an average expected total event size of approximately $7-10$ MB. Following the present established design, the CMS trigger and data acquisition system will continue to feature two trigger levels, with only one synchronous hardware-based Level-1 Trigger (L1), consisting of custom electronic boards and operating on dedicated data streams, and a second level, the High Level Trigger (HLT), using software algorithms running asynchronously on standard processors and making use of the full detector data to select events for offline storage and analysis. The upgraded CMS data acquisition system will collect data fragments for Level-1 accepted events from the detector back-end modules at a rate up to 750 kHz, aggregate fragments corresponding to individual Level-1 accepts into events, and distribute them to the HLT processors where they will be filtered further. Events accepted by the HLT will be stored permanently at a rate of up to 7.5 kHz. This paper describes the baseline design of the DAQ and HLT systems for the Phase-2 operation of CMS.
id cern-2767571
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2021
record_format invenio
spelling cern-27675712022-11-02T22:25:25Zhttp://cds.cern.ch/record/2767571engMeschi, EmilioThe Phase-2 Upgrade of the CMS Data Acquisition25th International Conference on Computing in High Energy & Nuclear PhysicsConferences<!--HTML-->The High Luminosity LHC (HL-LHC), will start operating in 2027 after the third Long Shutdown (LS3), and is designed to provide an ultimate instantaneous luminosity of $7.5\times10^{34}$ cm$^{-2}$ s$^{-1}$, at the price of extreme pileup of up to 200 interactions per crossing. The number of overlapping interactions in HL-LHC collisions, their density, and the resulting intense radiation environment, warrant an almost complete upgrade of the CMS detector. The upgraded CMS detector will be read out by approximately fifty thousand high-speed front-end optical links at an unprecedented data rate of up to 80~Tb/s, for an average expected total event size of approximately $7-10$ MB. Following the present established design, the CMS trigger and data acquisition system will continue to feature two trigger levels, with only one synchronous hardware-based Level-1 Trigger (L1), consisting of custom electronic boards and operating on dedicated data streams, and a second level, the High Level Trigger (HLT), using software algorithms running asynchronously on standard processors and making use of the full detector data to select events for offline storage and analysis. The upgraded CMS data acquisition system will collect data fragments for Level-1 accepted events from the detector back-end modules at a rate up to 750 kHz, aggregate fragments corresponding to individual Level-1 accepts into events, and distribute them to the HLT processors where they will be filtered further. Events accepted by the HLT will be stored permanently at a rate of up to 7.5 kHz. This paper describes the baseline design of the DAQ and HLT systems for the Phase-2 operation of CMS.oai:cds.cern.ch:27675712021
spellingShingle Conferences
Meschi, Emilio
The Phase-2 Upgrade of the CMS Data Acquisition
title The Phase-2 Upgrade of the CMS Data Acquisition
title_full The Phase-2 Upgrade of the CMS Data Acquisition
title_fullStr The Phase-2 Upgrade of the CMS Data Acquisition
title_full_unstemmed The Phase-2 Upgrade of the CMS Data Acquisition
title_short The Phase-2 Upgrade of the CMS Data Acquisition
title_sort phase-2 upgrade of the cms data acquisition
topic Conferences
url http://cds.cern.ch/record/2767571
work_keys_str_mv AT meschiemilio thephase2upgradeofthecmsdataacquisition
AT meschiemilio 25thinternationalconferenceoncomputinginhighenergynuclearphysics
AT meschiemilio phase2upgradeofthecmsdataacquisition