Cargando…
Installation of final sector onto the ATLAS New Small Wheel (NSW)
ATLAS team members install the final sector, one of the last of the eight 'slices' or 'wedges', onto the ATLAS New Small Wheel muon detector (NSW). The New Small Wheel upgrade is the most challenging and complex one of the ATLAS phase-I upgrade projects.
Autor principal: | Brice, Maximilien |
---|---|
Publicado: |
2021
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2770590 |
Ejemplares similares
-
The ATLAS New Small Wheels (NSW) detectors
por: Brice, Maximilien
Publicado: (2021) -
Assembly of the ATLAS New Small Wheels (NSW) detectors
por: Maximilien, Brice
Publicado: (2020) -
New Small Wheel (NSW) descent into ATLAS' "side A" of the experimental cavern
por: Brice, Maximilien, et al.
Publicado: (2021) -
Construction of Micromegas at Building 899 (BB5) and Small Strip Thin-gap Chambers at B180 for the ATLAS New Small Wheel (NSW)
por: Maximilien, Brice
Publicado: (2020) -
Construction of the ATLAS New Small Wheels (NSW) in Building 180 and 181
por: Caraban Gonzalez, Noemi
Publicado: (2020)