Cargando…

Integration and Commissioning of the Front-End Electronics of NSW ATLAS small-strip Thin Gap Chambers

The ATLAS Muon Spectrometer is going through an extensive Phase I upgrade to cope up with the future LHC runs of high luminosity of up to $7.5 \times 10^{34} cm^{-2} s^{-1}$. The innermost and first station of the Muon end cap system, the Small Wheel, will be replaced by the New Small Wheel, which h...

Descripción completa

Detalles Bibliográficos
Autor principal: Atmasiddha, Prachi
Lenguaje:eng
Publicado: 2021
Materias:
Acceso en línea:http://cds.cern.ch/record/2776218
_version_ 1780971611628765184
author Atmasiddha, Prachi
author_facet Atmasiddha, Prachi
author_sort Atmasiddha, Prachi
collection CERN
description The ATLAS Muon Spectrometer is going through an extensive Phase I upgrade to cope up with the future LHC runs of high luminosity of up to $7.5 \times 10^{34} cm^{-2} s^{-1}$. The innermost and first station of the Muon end cap system, the Small Wheel, will be replaced by the New Small Wheel, which has high trigger and precision tracking capabilities. This is achieved by a combination of two detector technologies, Small-Strip Thin Gas Chamber (sTGC) and Micro Mesh Gaseous structures (MM). MM is used for the precision tracking and sTGC is used as a primary trigger detector because of its timing resolution (drift time of most electrons shorter than one bunch crossing period (25 ns) and the front-end ASICs (Application Specific Integrated Circuit), VMMs, can make measurement with precision of 2 ns along with the amplitude measurement). Our team is working extensively on the integration and commissioning of the front-end electronics for the sTGC chambers. Considering the complexity of the system we are dealing with, we are working to resolve many challenges to test large number of physical channels ( 354K) with three different types – pads, strips and wires and ASICs (more than 11K) . We will present our experiences with the trigger and the readout tests of the electronics.
id cern-2776218
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2021
record_format invenio
spelling cern-27762182021-07-19T19:11:57Zhttp://cds.cern.ch/record/2776218engAtmasiddha, PrachiIntegration and Commissioning of the Front-End Electronics of NSW ATLAS small-strip Thin Gap ChambersParticle Physics - ExperimentThe ATLAS Muon Spectrometer is going through an extensive Phase I upgrade to cope up with the future LHC runs of high luminosity of up to $7.5 \times 10^{34} cm^{-2} s^{-1}$. The innermost and first station of the Muon end cap system, the Small Wheel, will be replaced by the New Small Wheel, which has high trigger and precision tracking capabilities. This is achieved by a combination of two detector technologies, Small-Strip Thin Gas Chamber (sTGC) and Micro Mesh Gaseous structures (MM). MM is used for the precision tracking and sTGC is used as a primary trigger detector because of its timing resolution (drift time of most electrons shorter than one bunch crossing period (25 ns) and the front-end ASICs (Application Specific Integrated Circuit), VMMs, can make measurement with precision of 2 ns along with the amplitude measurement). Our team is working extensively on the integration and commissioning of the front-end electronics for the sTGC chambers. Considering the complexity of the system we are dealing with, we are working to resolve many challenges to test large number of physical channels ( 354K) with three different types – pads, strips and wires and ASICs (more than 11K) . We will present our experiences with the trigger and the readout tests of the electronics.ATL-MUON-SLIDE-2021-330oai:cds.cern.ch:27762182021-07-19
spellingShingle Particle Physics - Experiment
Atmasiddha, Prachi
Integration and Commissioning of the Front-End Electronics of NSW ATLAS small-strip Thin Gap Chambers
title Integration and Commissioning of the Front-End Electronics of NSW ATLAS small-strip Thin Gap Chambers
title_full Integration and Commissioning of the Front-End Electronics of NSW ATLAS small-strip Thin Gap Chambers
title_fullStr Integration and Commissioning of the Front-End Electronics of NSW ATLAS small-strip Thin Gap Chambers
title_full_unstemmed Integration and Commissioning of the Front-End Electronics of NSW ATLAS small-strip Thin Gap Chambers
title_short Integration and Commissioning of the Front-End Electronics of NSW ATLAS small-strip Thin Gap Chambers
title_sort integration and commissioning of the front-end electronics of nsw atlas small-strip thin gap chambers
topic Particle Physics - Experiment
url http://cds.cern.ch/record/2776218
work_keys_str_mv AT atmasiddhaprachi integrationandcommissioningofthefrontendelectronicsofnswatlassmallstripthingapchambers