HiRadMat experiment installation for the first beam time run after LS2
Four different experiments (HRMT-52 BTV, HRMT-53 CHEFT, HRMT-54 BPM, HRMT-55 BLM3) were installed in the HiRadMat Facility for the first beam time run of this year after LS2. During HRMT-52 the performance of different beam screen materials for highly-focused, high-intensity beams were evaluated. No...
Autores principales: | , , |
---|---|
Publicado: |
2021
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2778750 |
Sumario: | Four different experiments (HRMT-52 BTV, HRMT-53 CHEFT, HRMT-54 BPM, HRMT-55 BLM3) were installed in the HiRadMat Facility for the first beam time run of this year after LS2. During HRMT-52 the performance of different beam screen materials for highly-focused, high-intensity beams were evaluated. Novel carbon nanotube wires were irradiated in HRMT-53 CHEFT for the next-generation of wirescanners. HRMT-54 BPM tested electro-optical and RF-based beam position monitor prototypes for the HiLumi upgrade of LHC. HRMT-55 BLM3 is using the mixed radiaton-field inside the HiRadMat Facility to calibrate production and prototype Beam Loss Monitors for LHC, SPS and various other facilities (ESS and FAIR). HiRadMat (or High-Radiation to Materials) is a users facility at CERN, designed to provide high-intensity pulsed beams to an irradiation area where material samples as well as accelerator component assemblies can be tested. |
---|