HiRadMat experiment installation for the first beam time run after LS2

Four different experiments (HRMT-52 BTV, HRMT-53 CHEFT, HRMT-54 BPM, HRMT-55 BLM3) were installed in the HiRadMat Facility for the first beam time run of this year after LS2. During HRMT-52 the performance of different beam screen materials for highly-focused, high-intensity beams were evaluated. No...

Descripción completa

Detalles Bibliográficos
Autores principales: Traczyk, Piotr, Simon, Pascal, Hertzog, Samuel Joseph
Publicado: 2021
Materias:
LS2
Acceso en línea:http://cds.cern.ch/record/2778750
_version_ 1780971761785896960
author Traczyk, Piotr
Simon, Pascal
Hertzog, Samuel Joseph
author_facet Traczyk, Piotr
Simon, Pascal
Hertzog, Samuel Joseph
author_sort Traczyk, Piotr
collection CERN
description Four different experiments (HRMT-52 BTV, HRMT-53 CHEFT, HRMT-54 BPM, HRMT-55 BLM3) were installed in the HiRadMat Facility for the first beam time run of this year after LS2. During HRMT-52 the performance of different beam screen materials for highly-focused, high-intensity beams were evaluated. Novel carbon nanotube wires were irradiated in HRMT-53 CHEFT for the next-generation of wirescanners. HRMT-54 BPM tested electro-optical and RF-based beam position monitor prototypes for the HiLumi upgrade of LHC. HRMT-55 BLM3 is using the mixed radiaton-field inside the HiRadMat Facility to calibrate production and prototype Beam Loss Monitors for LHC, SPS and various other facilities (ESS and FAIR). HiRadMat (or High-Radiation to Materials) is a users facility at CERN, designed to provide high-intensity pulsed beams to an irradiation area where material samples as well as accelerator component assemblies can be tested.
id cern-2778750
institution Organización Europea para la Investigación Nuclear
publishDate 2021
record_format invenio
spelling cern-27787502022-03-30T15:08:23Zhttp://cds.cern.ch/record/2778750Traczyk, PiotrSimon, PascalHertzog, Samuel JosephHiRadMat experiment installation for the first beam time run after LS2LS2Four different experiments (HRMT-52 BTV, HRMT-53 CHEFT, HRMT-54 BPM, HRMT-55 BLM3) were installed in the HiRadMat Facility for the first beam time run of this year after LS2. During HRMT-52 the performance of different beam screen materials for highly-focused, high-intensity beams were evaluated. Novel carbon nanotube wires were irradiated in HRMT-53 CHEFT for the next-generation of wirescanners. HRMT-54 BPM tested electro-optical and RF-based beam position monitor prototypes for the HiLumi upgrade of LHC. HRMT-55 BLM3 is using the mixed radiaton-field inside the HiRadMat Facility to calibrate production and prototype Beam Loss Monitors for LHC, SPS and various other facilities (ESS and FAIR). HiRadMat (or High-Radiation to Materials) is a users facility at CERN, designed to provide high-intensity pulsed beams to an irradiation area where material samples as well as accelerator component assemblies can be tested.CERN-PHOTO-202108-107oai:cds.cern.ch:27787502021
spellingShingle LS2
Traczyk, Piotr
Simon, Pascal
Hertzog, Samuel Joseph
HiRadMat experiment installation for the first beam time run after LS2
title HiRadMat experiment installation for the first beam time run after LS2
title_full HiRadMat experiment installation for the first beam time run after LS2
title_fullStr HiRadMat experiment installation for the first beam time run after LS2
title_full_unstemmed HiRadMat experiment installation for the first beam time run after LS2
title_short HiRadMat experiment installation for the first beam time run after LS2
title_sort hiradmat experiment installation for the first beam time run after ls2
topic LS2
url http://cds.cern.ch/record/2778750
work_keys_str_mv AT traczykpiotr hiradmatexperimentinstallationforthefirstbeamtimerunafterls2
AT simonpascal hiradmatexperimentinstallationforthefirstbeamtimerunafterls2
AT hertzogsamueljoseph hiradmatexperimentinstallationforthefirstbeamtimerunafterls2