Cargando…
HiRadMat experiment installation for the first beam time run after LS2
Four different experiments (HRMT-52 BTV, HRMT-53 CHEFT, HRMT-54 BPM, HRMT-55 BLM3) were installed in the HiRadMat Facility for the first beam time run of this year after LS2. During HRMT-52 the performance of different beam screen materials for highly-focused, high-intensity beams were evaluated. No...
Autores principales: | , , |
---|---|
Publicado: |
2021
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2778750 |
_version_ | 1780971761785896960 |
---|---|
author | Traczyk, Piotr Simon, Pascal Hertzog, Samuel Joseph |
author_facet | Traczyk, Piotr Simon, Pascal Hertzog, Samuel Joseph |
author_sort | Traczyk, Piotr |
collection | CERN |
description | Four different experiments (HRMT-52 BTV, HRMT-53 CHEFT, HRMT-54 BPM, HRMT-55 BLM3) were installed in the HiRadMat Facility for the first beam time run of this year after LS2. During HRMT-52 the performance of different beam screen materials for highly-focused, high-intensity beams were evaluated. Novel carbon nanotube wires were irradiated in HRMT-53 CHEFT for the next-generation of wirescanners. HRMT-54 BPM tested electro-optical and RF-based beam position monitor prototypes for the HiLumi upgrade of LHC. HRMT-55 BLM3 is using the mixed radiaton-field inside the HiRadMat Facility to calibrate production and prototype Beam Loss Monitors for LHC, SPS and various other facilities (ESS and FAIR). HiRadMat (or High-Radiation to Materials) is a users facility at CERN, designed to provide high-intensity pulsed beams to an irradiation area where material samples as well as accelerator component assemblies can be tested. |
id | cern-2778750 |
institution | Organización Europea para la Investigación Nuclear |
publishDate | 2021 |
record_format | invenio |
spelling | cern-27787502022-03-30T15:08:23Zhttp://cds.cern.ch/record/2778750Traczyk, PiotrSimon, PascalHertzog, Samuel JosephHiRadMat experiment installation for the first beam time run after LS2LS2Four different experiments (HRMT-52 BTV, HRMT-53 CHEFT, HRMT-54 BPM, HRMT-55 BLM3) were installed in the HiRadMat Facility for the first beam time run of this year after LS2. During HRMT-52 the performance of different beam screen materials for highly-focused, high-intensity beams were evaluated. Novel carbon nanotube wires were irradiated in HRMT-53 CHEFT for the next-generation of wirescanners. HRMT-54 BPM tested electro-optical and RF-based beam position monitor prototypes for the HiLumi upgrade of LHC. HRMT-55 BLM3 is using the mixed radiaton-field inside the HiRadMat Facility to calibrate production and prototype Beam Loss Monitors for LHC, SPS and various other facilities (ESS and FAIR). HiRadMat (or High-Radiation to Materials) is a users facility at CERN, designed to provide high-intensity pulsed beams to an irradiation area where material samples as well as accelerator component assemblies can be tested.CERN-PHOTO-202108-107oai:cds.cern.ch:27787502021 |
spellingShingle | LS2 Traczyk, Piotr Simon, Pascal Hertzog, Samuel Joseph HiRadMat experiment installation for the first beam time run after LS2 |
title | HiRadMat experiment installation for the first beam time run after LS2 |
title_full | HiRadMat experiment installation for the first beam time run after LS2 |
title_fullStr | HiRadMat experiment installation for the first beam time run after LS2 |
title_full_unstemmed | HiRadMat experiment installation for the first beam time run after LS2 |
title_short | HiRadMat experiment installation for the first beam time run after LS2 |
title_sort | hiradmat experiment installation for the first beam time run after ls2 |
topic | LS2 |
url | http://cds.cern.ch/record/2778750 |
work_keys_str_mv | AT traczykpiotr hiradmatexperimentinstallationforthefirstbeamtimerunafterls2 AT simonpascal hiradmatexperimentinstallationforthefirstbeamtimerunafterls2 AT hertzogsamueljoseph hiradmatexperimentinstallationforthefirstbeamtimerunafterls2 |