Cargando…
Full-system commissioning of TGC frontend electronics for Phase-2 LHC-ATLAS
The Thin Gap Chambers (TGCs) of the LHC-ATLAS are responsible for triggering muons in the endcap region at the hardware trigger stage. The frontend system of TGC will be upgraded for HL-LHC to send binary hit-map at every bunch crossing (BC) to the backend system. Such an operation requires lots of...
Autor principal: | Aoki, Takumi |
---|---|
Lenguaje: | eng |
Publicado: |
2021
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2779092 |
Ejemplares similares
-
Full-system commissioning of TGC frontend electronics for Phase-2 LHC-ATLAS
por: Aoki, Takumi
Publicado: (2021) -
System-level performance study and commissioning of TGC frontend electronics for Phase-2 upgrade of LHC-ATLAS
por: Tanaka, Aoto
Publicado: (2021) -
System-level performance study and commissioning of TGC front-end electronics for Phase-2 upgrade of LHC-ATLAS
por: Tanaka, Aoto
Publicado: (2021) -
Complete design of maximally-automated self-driven control mechanism for a large scale electronics system and its application to the ATLAS Phase-II TGC system
por: Aoki, Takumi
Publicado: (2022) -
Upgrade of the ATLAS Monitored Drift Tube Frontend Electronics for the HL-LHC
por: Zhu, Junjie, et al.
Publicado: (2017)