Cargando…

The PLC Control System for the RF Upgrade of the Super Proton Synchrotron

During the CERN Long Shutdown 2 (LS2), the 200 MHz main acceleration system of the Super Proton Synchrotron (SPS) is being upgraded. Two cavities will be added to reach a total of six. Each new cavity will be powered by Solid State Power Amplifiers (SSPA) grouped into 16 "towers" of 80 mod...

Descripción completa

Detalles Bibliográficos
Autores principales: Oliveira, Joao Carlos, Arnaudon, Luca, Diaz Fontalva, Alejandro
Lenguaje:eng
Publicado: 2020
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-ICALEPCS2019-MOPHA103
http://cds.cern.ch/record/2779474