Cargando…
The PLC Control System for the RF Upgrade of the Super Proton Synchrotron
During the CERN Long Shutdown 2 (LS2), the 200 MHz main acceleration system of the Super Proton Synchrotron (SPS) is being upgraded. Two cavities will be added to reach a total of six. Each new cavity will be powered by Solid State Power Amplifiers (SSPA) grouped into 16 "towers" of 80 mod...
Autores principales: | Oliveira, Joao Carlos, Arnaudon, Luca, Diaz Fontalva, Alejandro |
---|---|
Lenguaje: | eng |
Publicado: |
2020
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-ICALEPCS2019-MOPHA103 http://cds.cern.ch/record/2779474 |
Ejemplares similares
-
Upgrade of the Super Proton Synchrotron Vertical Beam Dump System
por: Senaj, V, et al.
Publicado: (2010) -
Upgrade of the Control System for the LHC High Level RF
por: Brischetto, Ylenia, et al.
Publicado: (2020) -
The Superconducting Super Proton Synchrotron
por: Dyks, Luke Aidan, et al.
Publicado: (2019) -
Measurement of rf voltage in long traveling wave accelerating structures with application to the CERN Super Proton Synchrotron
por: Kramer, Patrick, et al.
Publicado: (2019) -
Use of VME CPU modules for performance upgrade of G64 equipment controllers for the LEP RF system
por: Arnaudon, L, et al.
Publicado: (1994)