A High Throughput Production Scale Front-End Hybrid Test System for the CMS Phase-2 Tracker Upgrade

More than twenty-five thousand hybrids will be produced for the CMS Outer Tracker Phase-2 Upgrade. The hybrids are assembled with flip-chips, passives and carbon-fibre stiffeners. They will be glued to their module supports, together with powering and optical transmission hybrids, making repairs alm...

Descripción completa

Detalles Bibliográficos
Autores principales: Kovacs, Mark Istvan, Baesso, Paolo Giuseppe, Blanchot, Georges, De Clercq, Jarne Theo, Di Croce, Davide, Gajanec, Rafael, Haranko, Mykyta, Makarenko, Inna, Rasevic, Nikola, Zografos, Angelos
Lenguaje:eng
Publicado: 2019
Materias:
Acceso en línea:http://cds.cern.ch/record/2780276
_version_ 1780971857735843840
author Kovacs, Mark Istvan
Baesso, Paolo Giuseppe
Blanchot, Georges
De Clercq, Jarne Theo
Di Croce, Davide
Gajanec, Rafael
Haranko, Mykyta
Makarenko, Inna
Rasevic, Nikola
Zografos, Angelos
author_facet Kovacs, Mark Istvan
Baesso, Paolo Giuseppe
Blanchot, Georges
De Clercq, Jarne Theo
Di Croce, Davide
Gajanec, Rafael
Haranko, Mykyta
Makarenko, Inna
Rasevic, Nikola
Zografos, Angelos
author_sort Kovacs, Mark Istvan
collection CERN
description More than twenty-five thousand hybrids will be produced for the CMS Outer Tracker Phase-2 Upgrade. The hybrids are assembled with flip-chips, passives and carbon-fibre stiffeners. They will be glued to their module supports, together with powering and optical transmission hybrids, making repairs almost impossible. Due to the complexity of the hybrid circuits and the circuit assembly, production scale testing is a very important aspect. A crate-based scalable test system was designed to enable a multiplexed test of front-end hybrids. A test card was produced for the 2S hybrids and two different hybrid test cards are under development.
id cern-2780276
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2019
record_format invenio
spelling cern-27802762021-09-06T19:04:56Zhttp://cds.cern.ch/record/2780276engKovacs, Mark IstvanBaesso, Paolo GiuseppeBlanchot, GeorgesDe Clercq, Jarne TheoDi Croce, DavideGajanec, RafaelHaranko, MykytaMakarenko, InnaRasevic, NikolaZografos, AngelosA High Throughput Production Scale Front-End Hybrid Test System for the CMS Phase-2 Tracker UpgradeDetectors and Experimental TechniquesMore than twenty-five thousand hybrids will be produced for the CMS Outer Tracker Phase-2 Upgrade. The hybrids are assembled with flip-chips, passives and carbon-fibre stiffeners. They will be glued to their module supports, together with powering and optical transmission hybrids, making repairs almost impossible. Due to the complexity of the hybrid circuits and the circuit assembly, production scale testing is a very important aspect. A crate-based scalable test system was designed to enable a multiplexed test of front-end hybrids. A test card was produced for the 2S hybrids and two different hybrid test cards are under development.CMS-CR-2019-225oai:cds.cern.ch:27802762019-10-13
spellingShingle Detectors and Experimental Techniques
Kovacs, Mark Istvan
Baesso, Paolo Giuseppe
Blanchot, Georges
De Clercq, Jarne Theo
Di Croce, Davide
Gajanec, Rafael
Haranko, Mykyta
Makarenko, Inna
Rasevic, Nikola
Zografos, Angelos
A High Throughput Production Scale Front-End Hybrid Test System for the CMS Phase-2 Tracker Upgrade
title A High Throughput Production Scale Front-End Hybrid Test System for the CMS Phase-2 Tracker Upgrade
title_full A High Throughput Production Scale Front-End Hybrid Test System for the CMS Phase-2 Tracker Upgrade
title_fullStr A High Throughput Production Scale Front-End Hybrid Test System for the CMS Phase-2 Tracker Upgrade
title_full_unstemmed A High Throughput Production Scale Front-End Hybrid Test System for the CMS Phase-2 Tracker Upgrade
title_short A High Throughput Production Scale Front-End Hybrid Test System for the CMS Phase-2 Tracker Upgrade
title_sort high throughput production scale front-end hybrid test system for the cms phase-2 tracker upgrade
topic Detectors and Experimental Techniques
url http://cds.cern.ch/record/2780276
work_keys_str_mv AT kovacsmarkistvan ahighthroughputproductionscalefrontendhybridtestsystemforthecmsphase2trackerupgrade
AT baessopaologiuseppe ahighthroughputproductionscalefrontendhybridtestsystemforthecmsphase2trackerupgrade
AT blanchotgeorges ahighthroughputproductionscalefrontendhybridtestsystemforthecmsphase2trackerupgrade
AT declercqjarnetheo ahighthroughputproductionscalefrontendhybridtestsystemforthecmsphase2trackerupgrade
AT dicrocedavide ahighthroughputproductionscalefrontendhybridtestsystemforthecmsphase2trackerupgrade
AT gajanecrafael ahighthroughputproductionscalefrontendhybridtestsystemforthecmsphase2trackerupgrade
AT harankomykyta ahighthroughputproductionscalefrontendhybridtestsystemforthecmsphase2trackerupgrade
AT makarenkoinna ahighthroughputproductionscalefrontendhybridtestsystemforthecmsphase2trackerupgrade
AT rasevicnikola ahighthroughputproductionscalefrontendhybridtestsystemforthecmsphase2trackerupgrade
AT zografosangelos ahighthroughputproductionscalefrontendhybridtestsystemforthecmsphase2trackerupgrade
AT kovacsmarkistvan highthroughputproductionscalefrontendhybridtestsystemforthecmsphase2trackerupgrade
AT baessopaologiuseppe highthroughputproductionscalefrontendhybridtestsystemforthecmsphase2trackerupgrade
AT blanchotgeorges highthroughputproductionscalefrontendhybridtestsystemforthecmsphase2trackerupgrade
AT declercqjarnetheo highthroughputproductionscalefrontendhybridtestsystemforthecmsphase2trackerupgrade
AT dicrocedavide highthroughputproductionscalefrontendhybridtestsystemforthecmsphase2trackerupgrade
AT gajanecrafael highthroughputproductionscalefrontendhybridtestsystemforthecmsphase2trackerupgrade
AT harankomykyta highthroughputproductionscalefrontendhybridtestsystemforthecmsphase2trackerupgrade
AT makarenkoinna highthroughputproductionscalefrontendhybridtestsystemforthecmsphase2trackerupgrade
AT rasevicnikola highthroughputproductionscalefrontendhybridtestsystemforthecmsphase2trackerupgrade
AT zografosangelos highthroughputproductionscalefrontendhybridtestsystemforthecmsphase2trackerupgrade