Cargando…

Performance of prototype GE1$\slash$1 chambers for the CMS muon spectrometer upgrade

The high-luminosity phase of the Large Hadron Collider (HL-LHC) will result in ten times higher particle background than measured during the first phase of LHC operation. In order to fully exploit the highly-demanding operating conditions during HL-LHC, the Compact Muon Solenoid (CMS) Collaboration...

Descripción completa

Detalles Bibliográficos
Autor principal: The CMS Muon Group
Lenguaje:eng
Publicado: 2019
Materias:
Acceso en línea:http://cds.cern.ch/record/2781743
_version_ 1780971955566936064
author The CMS Muon Group
author_facet The CMS Muon Group
author_sort The CMS Muon Group
collection CERN
description The high-luminosity phase of the Large Hadron Collider (HL-LHC) will result in ten times higher particle background than measured during the first phase of LHC operation. In order to fully exploit the highly-demanding operating conditions during HL-LHC, the Compact Muon Solenoid (CMS) Collaboration will use Gas Electron Multiplier (GEM) detector technology. The technology will be integrated into the innermost region of the forward muon spectrometer of CMS as an additional muon station called GE1$\slash$1. The primary purpose of this auxiliary station is to help in muon reconstruction and to control level-1 muon trigger rates in the pseudo-rapidity region $1.6 <\mid\eta\mid<2.2$. The new station will contain trapezoidal-shaped GEM detectors called GE1$\slash$1 chambers. The design of these chambers is finalized, and the installation is in progress during the Long Shutdown phase two (LS-2) that started in 2019. Several full-size prototypes were built and operated successfully in various test beams at CERN. We describe performance measurements such as gain, efficiency, and time resolution of these prototype chambers, developed after years of R$\&$D, and summarize their behavior in different gas compositions as a function of the applied voltage.
id cern-2781743
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2019
record_format invenio
spelling cern-27817432021-09-21T18:54:47Zhttp://cds.cern.ch/record/2781743engThe CMS Muon GroupPerformance of prototype GE1$\slash$1 chambers for the CMS muon spectrometer upgradeDetectors and Experimental TechniquesThe high-luminosity phase of the Large Hadron Collider (HL-LHC) will result in ten times higher particle background than measured during the first phase of LHC operation. In order to fully exploit the highly-demanding operating conditions during HL-LHC, the Compact Muon Solenoid (CMS) Collaboration will use Gas Electron Multiplier (GEM) detector technology. The technology will be integrated into the innermost region of the forward muon spectrometer of CMS as an additional muon station called GE1$\slash$1. The primary purpose of this auxiliary station is to help in muon reconstruction and to control level-1 muon trigger rates in the pseudo-rapidity region $1.6 <\mid\eta\mid<2.2$. The new station will contain trapezoidal-shaped GEM detectors called GE1$\slash$1 chambers. The design of these chambers is finalized, and the installation is in progress during the Long Shutdown phase two (LS-2) that started in 2019. Several full-size prototypes were built and operated successfully in various test beams at CERN. We describe performance measurements such as gain, efficiency, and time resolution of these prototype chambers, developed after years of R$\&$D, and summarize their behavior in different gas compositions as a function of the applied voltage.CMS-NOTE-2020-001CERN-CMS-NOTE-2020-001oai:cds.cern.ch:27817432019-10-04
spellingShingle Detectors and Experimental Techniques
The CMS Muon Group
Performance of prototype GE1$\slash$1 chambers for the CMS muon spectrometer upgrade
title Performance of prototype GE1$\slash$1 chambers for the CMS muon spectrometer upgrade
title_full Performance of prototype GE1$\slash$1 chambers for the CMS muon spectrometer upgrade
title_fullStr Performance of prototype GE1$\slash$1 chambers for the CMS muon spectrometer upgrade
title_full_unstemmed Performance of prototype GE1$\slash$1 chambers for the CMS muon spectrometer upgrade
title_short Performance of prototype GE1$\slash$1 chambers for the CMS muon spectrometer upgrade
title_sort performance of prototype ge1$\slash$1 chambers for the cms muon spectrometer upgrade
topic Detectors and Experimental Techniques
url http://cds.cern.ch/record/2781743
work_keys_str_mv AT thecmsmuongroup performanceofprototypege1slash1chambersforthecmsmuonspectrometerupgrade