Cargando…
The ETROC1: The first full chain precision timing prototype for CMS MTD Endcap Timing Layer (ETL) upgrade
<!--HTML-->The Endcap Timing Readout Chip (ETROC) is being developed for the CMS MTD Endcap Timing Layer (ETL) for the HL-LHC, to process LGAD signals with time resolution down to 30ps per track. The ETROC1 is the first full chain precision timing prototype, including preamplifier and discrimi...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2021
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2782350 |
_version_ | 1780971996794847232 |
---|---|
author | Liu, Tiehui Ted |
author_facet | Liu, Tiehui Ted |
author_sort | Liu, Tiehui Ted |
collection | CERN |
description | <!--HTML-->The Endcap Timing Readout Chip (ETROC) is being developed for the CMS MTD Endcap Timing Layer (ETL) for the HL-LHC, to process LGAD signals with time resolution down to 30ps per track. The ETROC1 is the first full chain precision timing prototype, including preamplifier and discriminator, as well as a new low power TDC design that performs time-of-arrival (TOA) and time-over-threshold (TOT) measurements. It also includes a 4x4 pixel array with precision clock distribution network that is scalable to the final full size 16x16 array. The performance of ETROC1 with bench test and beam test results are presented. |
id | cern-2782350 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2021 |
record_format | invenio |
spelling | cern-27823502022-11-02T22:02:14Zhttp://cds.cern.ch/record/2782350engLiu, Tiehui TedThe ETROC1: The first full chain precision timing prototype for CMS MTD Endcap Timing Layer (ETL) upgradeTWEPP 2021 Topical Workshop on Electronics for Particle PhysicsConferences<!--HTML-->The Endcap Timing Readout Chip (ETROC) is being developed for the CMS MTD Endcap Timing Layer (ETL) for the HL-LHC, to process LGAD signals with time resolution down to 30ps per track. The ETROC1 is the first full chain precision timing prototype, including preamplifier and discriminator, as well as a new low power TDC design that performs time-of-arrival (TOA) and time-over-threshold (TOT) measurements. It also includes a 4x4 pixel array with precision clock distribution network that is scalable to the final full size 16x16 array. The performance of ETROC1 with bench test and beam test results are presented.oai:cds.cern.ch:27823502021 |
spellingShingle | Conferences Liu, Tiehui Ted The ETROC1: The first full chain precision timing prototype for CMS MTD Endcap Timing Layer (ETL) upgrade |
title | The ETROC1: The first full chain precision timing prototype for CMS MTD Endcap Timing Layer (ETL) upgrade |
title_full | The ETROC1: The first full chain precision timing prototype for CMS MTD Endcap Timing Layer (ETL) upgrade |
title_fullStr | The ETROC1: The first full chain precision timing prototype for CMS MTD Endcap Timing Layer (ETL) upgrade |
title_full_unstemmed | The ETROC1: The first full chain precision timing prototype for CMS MTD Endcap Timing Layer (ETL) upgrade |
title_short | The ETROC1: The first full chain precision timing prototype for CMS MTD Endcap Timing Layer (ETL) upgrade |
title_sort | etroc1: the first full chain precision timing prototype for cms mtd endcap timing layer (etl) upgrade |
topic | Conferences |
url | http://cds.cern.ch/record/2782350 |
work_keys_str_mv | AT liutiehuited theetroc1thefirstfullchainprecisiontimingprototypeforcmsmtdendcaptiminglayeretlupgrade AT liutiehuited twepp2021topicalworkshoponelectronicsforparticlephysics AT liutiehuited etroc1thefirstfullchainprecisiontimingprototypeforcmsmtdendcaptiminglayeretlupgrade |