Cargando…

The ETROC1: The first full chain precision timing prototype for CMS MTD Endcap Timing Layer (ETL) upgrade

<!--HTML-->The Endcap Timing Readout Chip (ETROC) is being developed for the CMS MTD Endcap Timing Layer (ETL) for the HL-LHC, to process LGAD signals with time resolution down to 30ps per track. The ETROC1 is the first full chain precision timing prototype, including preamplifier and discrimi...

Descripción completa

Detalles Bibliográficos
Autor principal: Liu, Tiehui Ted
Lenguaje:eng
Publicado: 2021
Materias:
Acceso en línea:http://cds.cern.ch/record/2782350
_version_ 1780971996794847232
author Liu, Tiehui Ted
author_facet Liu, Tiehui Ted
author_sort Liu, Tiehui Ted
collection CERN
description <!--HTML-->The Endcap Timing Readout Chip (ETROC) is being developed for the CMS MTD Endcap Timing Layer (ETL) for the HL-LHC, to process LGAD signals with time resolution down to 30ps per track. The ETROC1 is the first full chain precision timing prototype, including preamplifier and discriminator, as well as a new low power TDC design that performs time-of-arrival (TOA) and time-over-threshold (TOT) measurements. It also includes a 4x4 pixel array with precision clock distribution network that is scalable to the final full size 16x16 array. The performance of ETROC1 with bench test and beam test results are presented.
id cern-2782350
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2021
record_format invenio
spelling cern-27823502022-11-02T22:02:14Zhttp://cds.cern.ch/record/2782350engLiu, Tiehui TedThe ETROC1: The first full chain precision timing prototype for CMS MTD Endcap Timing Layer (ETL) upgradeTWEPP 2021 Topical Workshop on Electronics for Particle PhysicsConferences<!--HTML-->The Endcap Timing Readout Chip (ETROC) is being developed for the CMS MTD Endcap Timing Layer (ETL) for the HL-LHC, to process LGAD signals with time resolution down to 30ps per track. The ETROC1 is the first full chain precision timing prototype, including preamplifier and discriminator, as well as a new low power TDC design that performs time-of-arrival (TOA) and time-over-threshold (TOT) measurements. It also includes a 4x4 pixel array with precision clock distribution network that is scalable to the final full size 16x16 array. The performance of ETROC1 with bench test and beam test results are presented.oai:cds.cern.ch:27823502021
spellingShingle Conferences
Liu, Tiehui Ted
The ETROC1: The first full chain precision timing prototype for CMS MTD Endcap Timing Layer (ETL) upgrade
title The ETROC1: The first full chain precision timing prototype for CMS MTD Endcap Timing Layer (ETL) upgrade
title_full The ETROC1: The first full chain precision timing prototype for CMS MTD Endcap Timing Layer (ETL) upgrade
title_fullStr The ETROC1: The first full chain precision timing prototype for CMS MTD Endcap Timing Layer (ETL) upgrade
title_full_unstemmed The ETROC1: The first full chain precision timing prototype for CMS MTD Endcap Timing Layer (ETL) upgrade
title_short The ETROC1: The first full chain precision timing prototype for CMS MTD Endcap Timing Layer (ETL) upgrade
title_sort etroc1: the first full chain precision timing prototype for cms mtd endcap timing layer (etl) upgrade
topic Conferences
url http://cds.cern.ch/record/2782350
work_keys_str_mv AT liutiehuited theetroc1thefirstfullchainprecisiontimingprototypeforcmsmtdendcaptiminglayeretlupgrade
AT liutiehuited twepp2021topicalworkshoponelectronicsforparticlephysics
AT liutiehuited etroc1thefirstfullchainprecisiontimingprototypeforcmsmtdendcaptiminglayeretlupgrade