Cargando…
The Prototype Hardware Design and Test of Global Common Module for Global Trigger System of the ATLAS Phase II Upgrade
<!--HTML-->The HL-LHC will start operations in 2027, to deliver more than ten times the integrated luminosity of the LHC Runs 1-3 combined. Meeting these requirements poses significant challenges to the hardware design of the Trigger and Data Acquisition system. Global Trigger is a new subsyst...
Autor principal: | Bonini, Filiberto |
---|---|
Lenguaje: | eng |
Publicado: |
2021
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2782404 |
Ejemplares similares
-
Prototype Hardware Design and Testing of the Global Common Module for the Global Trigger Subsystem of the ATLAS Phase-II Upgrade
por: Bonini, Filiberto, et al.
Publicado: (2021) -
The Prototype Hardware Design and Test of Global Common Module for Global Trigger System of the ATLAS Phase II Upgrade
por: Tang, Shaochun, et al.
Publicado: (2021) -
Prototype Hardware Design and Testing of the Global Common Module (GCM) for the Global Trigger subsystem of the ATLAS Phase-II Upgrade
por: Bonini, Filiberto, et al.
Publicado: (2021) -
The Prototype Hardware Design of Global Common Module for Global Trigger System of the ATLAS Phase-II Upgrade on HL-LHC
por: Tang, Shaochun, et al.
Publicado: (2020) -
Hardware Design and Testing of the Generic Rear Transition Module for the Global Trigger Subsystem of ATLAS Phase-II Upgrade
por: Bonini, Filiberto
Publicado: (2022)