PRACTICAL CHALLENGES OF THE LHC MAIN BEAM DUMP UPGRADES
The two Large Hadron Collider (LHC) beam dumps have to withstand arduous operating conditions and are essential for the safe and reliable operation of the collider. During the LHC Long Shutdown 2 (2019-2020), extensive work was carried out to upgrade the dumps to cope with the more demanding future...
Autores principales: | , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2021
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2786788 |
_version_ | 1780972121336315904 |
---|---|
author | Martin Ruiz, Jose Maria Kershaw, Keith Calviani, Marco Grenier, Damien Maestre Heredia, Jorge Torregrosa Martin, Claudio Leopoldo Buonocore, Luca Rosario Serrano Galvez, Pablo Matheson, Eloise Sola Merino, Jorge Guinchard, Michael Ferrari, Matteo Senajova, Dominika Bertone, Caterina Perez Ornedo, Maria Infantino, Angelo Tromel, Christophe |
author_facet | Martin Ruiz, Jose Maria Kershaw, Keith Calviani, Marco Grenier, Damien Maestre Heredia, Jorge Torregrosa Martin, Claudio Leopoldo Buonocore, Luca Rosario Serrano Galvez, Pablo Matheson, Eloise Sola Merino, Jorge Guinchard, Michael Ferrari, Matteo Senajova, Dominika Bertone, Caterina Perez Ornedo, Maria Infantino, Angelo Tromel, Christophe |
author_sort | Martin Ruiz, Jose Maria |
collection | CERN |
description | The two Large Hadron Collider (LHC) beam dumps have to withstand arduous operating conditions and are essential for the safe and reliable operation of the collider. During the LHC Long Shutdown 2 (2019-2020), extensive work was carried out to upgrade the dumps to cope with the more demanding future operating conditions of the LHC Run 3. The upgrades included modifications to the dump blocks, dump block supports and their lubrication, beam windows, the beam pipes leading to the dumps, and the nitrogen pressurisation system of the dump blocks. A comprehensive instrumentation system was installed to monitor the behaviour of the dumps. In addition, an internal endoscope inspection was performed on the ex-operational dumps to check their condition. Many of these operations had to be carried out in underground radiation areas, therefore the optimization of the dose-to-personnel according to the ALARA principle was an important consideration. The return on experience for these activities will be provided, including the critical tasks, unexpected events and lessons learnt. |
id | cern-2786788 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2021 |
record_format | invenio |
spelling | cern-27867882021-11-11T15:08:29Zhttp://cds.cern.ch/record/2786788engMartin Ruiz, Jose MariaKershaw, KeithCalviani, MarcoGrenier, DamienMaestre Heredia, JorgeTorregrosa Martin, Claudio LeopoldoBuonocore, Luca RosarioSerrano Galvez, PabloMatheson, EloiseSola Merino, JorgeGuinchard, MichaelFerrari, MatteoSenajova, DominikaBertone, CaterinaPerez Ornedo, MariaInfantino, AngeloTromel, ChristophePRACTICAL CHALLENGES OF THE LHC MAIN BEAM DUMP UPGRADESAccelerators and Storage RingsThe two Large Hadron Collider (LHC) beam dumps have to withstand arduous operating conditions and are essential for the safe and reliable operation of the collider. During the LHC Long Shutdown 2 (2019-2020), extensive work was carried out to upgrade the dumps to cope with the more demanding future operating conditions of the LHC Run 3. The upgrades included modifications to the dump blocks, dump block supports and their lubrication, beam windows, the beam pipes leading to the dumps, and the nitrogen pressurisation system of the dump blocks. A comprehensive instrumentation system was installed to monitor the behaviour of the dumps. In addition, an internal endoscope inspection was performed on the ex-operational dumps to check their condition. Many of these operations had to be carried out in underground radiation areas, therefore the optimization of the dose-to-personnel according to the ALARA principle was an important consideration. The return on experience for these activities will be provided, including the critical tasks, unexpected events and lessons learnt.CERN-ACC-NOTE-2021-0027oai:cds.cern.ch:27867882021-10-18 |
spellingShingle | Accelerators and Storage Rings Martin Ruiz, Jose Maria Kershaw, Keith Calviani, Marco Grenier, Damien Maestre Heredia, Jorge Torregrosa Martin, Claudio Leopoldo Buonocore, Luca Rosario Serrano Galvez, Pablo Matheson, Eloise Sola Merino, Jorge Guinchard, Michael Ferrari, Matteo Senajova, Dominika Bertone, Caterina Perez Ornedo, Maria Infantino, Angelo Tromel, Christophe PRACTICAL CHALLENGES OF THE LHC MAIN BEAM DUMP UPGRADES |
title | PRACTICAL CHALLENGES OF THE LHC MAIN BEAM DUMP UPGRADES |
title_full | PRACTICAL CHALLENGES OF THE LHC MAIN BEAM DUMP UPGRADES |
title_fullStr | PRACTICAL CHALLENGES OF THE LHC MAIN BEAM DUMP UPGRADES |
title_full_unstemmed | PRACTICAL CHALLENGES OF THE LHC MAIN BEAM DUMP UPGRADES |
title_short | PRACTICAL CHALLENGES OF THE LHC MAIN BEAM DUMP UPGRADES |
title_sort | practical challenges of the lhc main beam dump upgrades |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/2786788 |
work_keys_str_mv | AT martinruizjosemaria practicalchallengesofthelhcmainbeamdumpupgrades AT kershawkeith practicalchallengesofthelhcmainbeamdumpupgrades AT calvianimarco practicalchallengesofthelhcmainbeamdumpupgrades AT grenierdamien practicalchallengesofthelhcmainbeamdumpupgrades AT maestreherediajorge practicalchallengesofthelhcmainbeamdumpupgrades AT torregrosamartinclaudioleopoldo practicalchallengesofthelhcmainbeamdumpupgrades AT buonocorelucarosario practicalchallengesofthelhcmainbeamdumpupgrades AT serranogalvezpablo practicalchallengesofthelhcmainbeamdumpupgrades AT mathesoneloise practicalchallengesofthelhcmainbeamdumpupgrades AT solamerinojorge practicalchallengesofthelhcmainbeamdumpupgrades AT guinchardmichael practicalchallengesofthelhcmainbeamdumpupgrades AT ferrarimatteo practicalchallengesofthelhcmainbeamdumpupgrades AT senajovadominika practicalchallengesofthelhcmainbeamdumpupgrades AT bertonecaterina practicalchallengesofthelhcmainbeamdumpupgrades AT perezornedomaria practicalchallengesofthelhcmainbeamdumpupgrades AT infantinoangelo practicalchallengesofthelhcmainbeamdumpupgrades AT tromelchristophe practicalchallengesofthelhcmainbeamdumpupgrades |