Cargando…

PRACTICAL CHALLENGES OF THE LHC MAIN BEAM DUMP UPGRADES

The two Large Hadron Collider (LHC) beam dumps have to withstand arduous operating conditions and are essential for the safe and reliable operation of the collider. During the LHC Long Shutdown 2 (2019-2020), extensive work was carried out to upgrade the dumps to cope with the more demanding future...

Descripción completa

Detalles Bibliográficos
Autores principales: Martin Ruiz, Jose Maria, Kershaw, Keith, Calviani, Marco, Grenier, Damien, Maestre Heredia, Jorge, Torregrosa Martin, Claudio Leopoldo, Buonocore, Luca Rosario, Serrano Galvez, Pablo, Matheson, Eloise, Sola Merino, Jorge, Guinchard, Michael, Ferrari, Matteo, Senajova, Dominika, Bertone, Caterina, Perez Ornedo, Maria, Infantino, Angelo, Tromel, Christophe
Lenguaje:eng
Publicado: 2021
Materias:
Acceso en línea:http://cds.cern.ch/record/2786788
_version_ 1780972121336315904
author Martin Ruiz, Jose Maria
Kershaw, Keith
Calviani, Marco
Grenier, Damien
Maestre Heredia, Jorge
Torregrosa Martin, Claudio Leopoldo
Buonocore, Luca Rosario
Serrano Galvez, Pablo
Matheson, Eloise
Sola Merino, Jorge
Guinchard, Michael
Ferrari, Matteo
Senajova, Dominika
Bertone, Caterina
Perez Ornedo, Maria
Infantino, Angelo
Tromel, Christophe
author_facet Martin Ruiz, Jose Maria
Kershaw, Keith
Calviani, Marco
Grenier, Damien
Maestre Heredia, Jorge
Torregrosa Martin, Claudio Leopoldo
Buonocore, Luca Rosario
Serrano Galvez, Pablo
Matheson, Eloise
Sola Merino, Jorge
Guinchard, Michael
Ferrari, Matteo
Senajova, Dominika
Bertone, Caterina
Perez Ornedo, Maria
Infantino, Angelo
Tromel, Christophe
author_sort Martin Ruiz, Jose Maria
collection CERN
description The two Large Hadron Collider (LHC) beam dumps have to withstand arduous operating conditions and are essential for the safe and reliable operation of the collider. During the LHC Long Shutdown 2 (2019-2020), extensive work was carried out to upgrade the dumps to cope with the more demanding future operating conditions of the LHC Run 3. The upgrades included modifications to the dump blocks, dump block supports and their lubrication, beam windows, the beam pipes leading to the dumps, and the nitrogen pressurisation system of the dump blocks. A comprehensive instrumentation system was installed to monitor the behaviour of the dumps. In addition, an internal endoscope inspection was performed on the ex-operational dumps to check their condition. Many of these operations had to be carried out in underground radiation areas, therefore the optimization of the dose-to-personnel according to the ALARA principle was an important consideration. The return on experience for these activities will be provided, including the critical tasks, unexpected events and lessons learnt.
id cern-2786788
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2021
record_format invenio
spelling cern-27867882021-11-11T15:08:29Zhttp://cds.cern.ch/record/2786788engMartin Ruiz, Jose MariaKershaw, KeithCalviani, MarcoGrenier, DamienMaestre Heredia, JorgeTorregrosa Martin, Claudio LeopoldoBuonocore, Luca RosarioSerrano Galvez, PabloMatheson, EloiseSola Merino, JorgeGuinchard, MichaelFerrari, MatteoSenajova, DominikaBertone, CaterinaPerez Ornedo, MariaInfantino, AngeloTromel, ChristophePRACTICAL CHALLENGES OF THE LHC MAIN BEAM DUMP UPGRADESAccelerators and Storage RingsThe two Large Hadron Collider (LHC) beam dumps have to withstand arduous operating conditions and are essential for the safe and reliable operation of the collider. During the LHC Long Shutdown 2 (2019-2020), extensive work was carried out to upgrade the dumps to cope with the more demanding future operating conditions of the LHC Run 3. The upgrades included modifications to the dump blocks, dump block supports and their lubrication, beam windows, the beam pipes leading to the dumps, and the nitrogen pressurisation system of the dump blocks. A comprehensive instrumentation system was installed to monitor the behaviour of the dumps. In addition, an internal endoscope inspection was performed on the ex-operational dumps to check their condition. Many of these operations had to be carried out in underground radiation areas, therefore the optimization of the dose-to-personnel according to the ALARA principle was an important consideration. The return on experience for these activities will be provided, including the critical tasks, unexpected events and lessons learnt.CERN-ACC-NOTE-2021-0027oai:cds.cern.ch:27867882021-10-18
spellingShingle Accelerators and Storage Rings
Martin Ruiz, Jose Maria
Kershaw, Keith
Calviani, Marco
Grenier, Damien
Maestre Heredia, Jorge
Torregrosa Martin, Claudio Leopoldo
Buonocore, Luca Rosario
Serrano Galvez, Pablo
Matheson, Eloise
Sola Merino, Jorge
Guinchard, Michael
Ferrari, Matteo
Senajova, Dominika
Bertone, Caterina
Perez Ornedo, Maria
Infantino, Angelo
Tromel, Christophe
PRACTICAL CHALLENGES OF THE LHC MAIN BEAM DUMP UPGRADES
title PRACTICAL CHALLENGES OF THE LHC MAIN BEAM DUMP UPGRADES
title_full PRACTICAL CHALLENGES OF THE LHC MAIN BEAM DUMP UPGRADES
title_fullStr PRACTICAL CHALLENGES OF THE LHC MAIN BEAM DUMP UPGRADES
title_full_unstemmed PRACTICAL CHALLENGES OF THE LHC MAIN BEAM DUMP UPGRADES
title_short PRACTICAL CHALLENGES OF THE LHC MAIN BEAM DUMP UPGRADES
title_sort practical challenges of the lhc main beam dump upgrades
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/2786788
work_keys_str_mv AT martinruizjosemaria practicalchallengesofthelhcmainbeamdumpupgrades
AT kershawkeith practicalchallengesofthelhcmainbeamdumpupgrades
AT calvianimarco practicalchallengesofthelhcmainbeamdumpupgrades
AT grenierdamien practicalchallengesofthelhcmainbeamdumpupgrades
AT maestreherediajorge practicalchallengesofthelhcmainbeamdumpupgrades
AT torregrosamartinclaudioleopoldo practicalchallengesofthelhcmainbeamdumpupgrades
AT buonocorelucarosario practicalchallengesofthelhcmainbeamdumpupgrades
AT serranogalvezpablo practicalchallengesofthelhcmainbeamdumpupgrades
AT mathesoneloise practicalchallengesofthelhcmainbeamdumpupgrades
AT solamerinojorge practicalchallengesofthelhcmainbeamdumpupgrades
AT guinchardmichael practicalchallengesofthelhcmainbeamdumpupgrades
AT ferrarimatteo practicalchallengesofthelhcmainbeamdumpupgrades
AT senajovadominika practicalchallengesofthelhcmainbeamdumpupgrades
AT bertonecaterina practicalchallengesofthelhcmainbeamdumpupgrades
AT perezornedomaria practicalchallengesofthelhcmainbeamdumpupgrades
AT infantinoangelo practicalchallengesofthelhcmainbeamdumpupgrades
AT tromelchristophe practicalchallengesofthelhcmainbeamdumpupgrades