Cargando…

Characterization of a high bandwidth readout chain for the CMS phase-2 pixel upgrade

The CMS collaboration is building a new inner tracking pixel detector for the High-Luminosity LHC. Each pixel readout chip will be controlled with a single serial input stream at 160 Mb/s and will send out data via four current mode logic (CML) 1.28 Gb/s outputs. The readout chips will be grouped in...

Descripción completa

Detalles Bibliográficos
Autor principal: Smith, Caleb
Lenguaje:eng
Publicado: 2021
Materias:
Acceso en línea:https://dx.doi.org/10.1088/1748-0221/17/08/C08017
http://cds.cern.ch/record/2790737
_version_ 1780972263446675456
author Smith, Caleb
author_facet Smith, Caleb
author_sort Smith, Caleb
collection CERN
description The CMS collaboration is building a new inner tracking pixel detector for the High-Luminosity LHC. Each pixel readout chip will be controlled with a single serial input stream at 160 Mb/s and will send out data via four current mode logic (CML) 1.28 Gb/s outputs. The readout chips will be grouped in modules and connected with up to 1.6 meters long low-mass electrical links to Low-Power Gigabit Transceivers (lpGBT) and Versatile Link PLUS Transceiver (VTRx+) modules that send the data optically to off-detector electronics at 10 Gb/s. The characterization of these components and system tests of the readout chain are presented.
id cern-2790737
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2021
record_format invenio
spelling cern-27907372023-02-02T13:40:36Zdoi:10.1088/1748-0221/17/08/C08017http://cds.cern.ch/record/2790737engSmith, CalebCharacterization of a high bandwidth readout chain for the CMS phase-2 pixel upgradeParticle Physics - ExperimentDetectors and Experimental TechniquesThe CMS collaboration is building a new inner tracking pixel detector for the High-Luminosity LHC. Each pixel readout chip will be controlled with a single serial input stream at 160 Mb/s and will send out data via four current mode logic (CML) 1.28 Gb/s outputs. The readout chips will be grouped in modules and connected with up to 1.6 meters long low-mass electrical links to Low-Power Gigabit Transceivers (lpGBT) and Versatile Link PLUS Transceiver (VTRx+) modules that send the data optically to off-detector electronics at 10 Gb/s. The characterization of these components and system tests of the readout chain are presented.The CMS collaboration is building a new inner tracking pixel detector for the High-Luminosity LHC. Each pixel readout chip will be controlled with a single serial input stream at 160 Mbps and will send out data via four current mode logic (CML) 1.28 Gbps outputs. The readout chips will be grouped in modules and connected with up to 1.6 meters long low-mass electrical links to Low-Power Gigabit Transceivers (lpGBT) and Versatile Link PLUS Transceiver (VTRx+) modules that send the data optically to off-detector electronics at 10 Gbps. The characterization of these components and system tests of the readout chain are presented.arXiv:2110.14021oai:cds.cern.ch:27907372021-10-26
spellingShingle Particle Physics - Experiment
Detectors and Experimental Techniques
Smith, Caleb
Characterization of a high bandwidth readout chain for the CMS phase-2 pixel upgrade
title Characterization of a high bandwidth readout chain for the CMS phase-2 pixel upgrade
title_full Characterization of a high bandwidth readout chain for the CMS phase-2 pixel upgrade
title_fullStr Characterization of a high bandwidth readout chain for the CMS phase-2 pixel upgrade
title_full_unstemmed Characterization of a high bandwidth readout chain for the CMS phase-2 pixel upgrade
title_short Characterization of a high bandwidth readout chain for the CMS phase-2 pixel upgrade
title_sort characterization of a high bandwidth readout chain for the cms phase-2 pixel upgrade
topic Particle Physics - Experiment
Detectors and Experimental Techniques
url https://dx.doi.org/10.1088/1748-0221/17/08/C08017
http://cds.cern.ch/record/2790737
work_keys_str_mv AT smithcaleb characterizationofahighbandwidthreadoutchainforthecmsphase2pixelupgrade