Cargando…
Analytical Method (AM) for DT Trigger Primitive Generation in Phase 2. Performance results on simulation
A full replacement of the muon trigger system in the CMS (Compact Muon Solenoid) detector is envisaged for operating at the maximum instantaneous luminosities expected in HL-LHC (High Luminosity Large Hadron Collider) of about 5-7.5x10$^{34}$cm$^{-2}$s$^{-1}$. Under this scenario, the new on detecto...
Autor principal: | CMS Collaboration |
---|---|
Lenguaje: | eng |
Publicado: |
2021
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2792319 |
Ejemplares similares
-
Analytical Method (AM) for DT Trigger Primitive Generation in Phase 2
por: CMS Collaboration
Publicado: (2020) -
Analytical Method (AM) for DT Trigger Primitive Generation in Phase-2
por: CMS Collaboration
Publicado: (2021) -
Analytical Method (AM) for DT Trigger Primitive Generation in Phase 2. Slice Test Results with 2021 cosmics data
por: CMS Collaboration
Publicado: (2021) -
DT Local Trigger performance in 2015
por: CMS Collaboration
Publicado: (2015) -
Performance of DT Local Trigger with 25 ns BX time-spacing
por: CMS Collaboration
Publicado: (2013)