Cargando…

Commissioning and prospects of the first GEM station at the CMS experiment

The CMS Collaboration has been developing a Gas Electron Multiplier (GEM) detector in the endcap regions of the CMS muon system to maintain the high level of performance achieved during Run 2 in the challenging environment of the High Luminosity phase of the LHC (HL-LHC). The GEM chambers at endcap...

Descripción completa

Detalles Bibliográficos
Autor principal: Mocellin, Giovanni
Lenguaje:eng
Publicado: 2020
Materias:
Acceso en línea:http://cds.cern.ch/record/2792632
_version_ 1780972379175911424
author Mocellin, Giovanni
author_facet Mocellin, Giovanni
author_sort Mocellin, Giovanni
collection CERN
description The CMS Collaboration has been developing a Gas Electron Multiplier (GEM) detector in the endcap regions of the CMS muon system to maintain the high level of performance achieved during Run 2 in the challenging environment of the High Luminosity phase of the LHC (HL-LHC). The GEM chambers at endcap station 1 (GE1/1) have been installed in the second long shutdown. The technical and operational challenges of large-area GEM chambers have been identified during the commissioning of five GEM super chambers ("slice test") in Run 2. This lead to a modification in its system design. A test with cosmic-ray muons is the final stage of quality control before the full-scale installation in the CMS detector. We review the performance of muon detection in the slice test, an improvement of the readout system, commissioning status, and prospects for the muon trigger for Run 3.
id cern-2792632
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2020
record_format invenio
spelling cern-27926322021-12-10T19:48:20Zhttp://cds.cern.ch/record/2792632engMocellin, GiovanniCommissioning and prospects of the first GEM station at the CMS experimentDetectors and Experimental TechniquesThe CMS Collaboration has been developing a Gas Electron Multiplier (GEM) detector in the endcap regions of the CMS muon system to maintain the high level of performance achieved during Run 2 in the challenging environment of the High Luminosity phase of the LHC (HL-LHC). The GEM chambers at endcap station 1 (GE1/1) have been installed in the second long shutdown. The technical and operational challenges of large-area GEM chambers have been identified during the commissioning of five GEM super chambers ("slice test") in Run 2. This lead to a modification in its system design. A test with cosmic-ray muons is the final stage of quality control before the full-scale installation in the CMS detector. We review the performance of muon detection in the slice test, an improvement of the readout system, commissioning status, and prospects for the muon trigger for Run 3.CMS-CR-2020-174oai:cds.cern.ch:27926322020-10-16
spellingShingle Detectors and Experimental Techniques
Mocellin, Giovanni
Commissioning and prospects of the first GEM station at the CMS experiment
title Commissioning and prospects of the first GEM station at the CMS experiment
title_full Commissioning and prospects of the first GEM station at the CMS experiment
title_fullStr Commissioning and prospects of the first GEM station at the CMS experiment
title_full_unstemmed Commissioning and prospects of the first GEM station at the CMS experiment
title_short Commissioning and prospects of the first GEM station at the CMS experiment
title_sort commissioning and prospects of the first gem station at the cms experiment
topic Detectors and Experimental Techniques
url http://cds.cern.ch/record/2792632
work_keys_str_mv AT mocellingiovanni commissioningandprospectsofthefirstgemstationatthecmsexperiment