Cargando…

CMS RPC Activities During LHC LS-2

The second LHC long shutdown period (LS2) is an important opportunity for the CMS Resistive Plate Chambers (RPC) to complete their consolidation and upgrade projects. The consolidation includes detector maintenance for gas tightness, HV (high voltage), LV (low voltage) and slow control operation. Al...

Descripción completa

Detalles Bibliográficos
Autores principales: Shah, M.A., El Sawy, M., Samalan, A., Tytgat, M., Zaganidis, N., Alves, G.A., Marujo, F., Torres da Silva de Araujo, F., Da Costa, E.M., De Jesus Damiao, D., Nogima, H., Santoro, A., Fonseca De Souza, S., Aleksandrov, A., Hadjiiska, R., Iaydjiev, P., Rodozov, M., Shopova, M., Soultanov, G., Bonchev, M., Dimitrov, A., Litov, L., Pavlov, B., Petkov, P., Petrov, A., Qian, S.J., Bernal, C., Cabrera, A., Fraga, J., Sarkar, A., Elsayed, S., Assran, Y., Mahmoud, M.A., Mohammed, Y., Combaret, C., Gouzevitch, M., Grenier, G., Laktineh, I., Mirabito, L., Shchablo, K., Bagaturia, I., Lomidze, D., Lomidze, I., Bhatnagar, V., Gupta, R., Kumari, P., Singh, J., Amoozegar, V., Boghrati, B., Ebraimi, M., Ghasemi, R., Mohammadi Najafabadi, M., Zareian, E., Abbrescia, M., Aly, R., Elmetenawee, W., De Filippis, N., Franco, M., Gelmi, A., Iaselli, G., Lacalamita, N., Leszki, S., Loddo, F., Margjeka, I., Pugliese, G., Ramos, D., Caponero, M., Benussi, L., Bianco, S., Colafranceschi, S., Russo, A., Passamonti, L., Piccolo, D., Pierluigi, D., Saviano, G., Buontempo, S., Di Crescenzo, A., Fienga, F., De Lellis, G., Lista, L., Meola, S., Paolucci, P., Braghieri, A., Salvini, P., Montagna, P., Riccardi, C., Vitulo, P., Francois, B., Kim, T.J., Park, J., Choi, S.Y., Hong, B., Lee, K.S., Goh, J., Lee, H., Eysermans, J., Estrada, C. Uribe, Pedraza, I., Castilla-Valdez, H., Sanchez-Hernandez, A., Mondragon Herrera, C.A., Perez Navarro, D.A., Sanchez, G.A. Ayala, Carrillo, S., Vazquez, E., Radi, A., Ahmad, A., Asghar, I., Hoorani, H., Muhammad, S., Crotty, I.
Lenguaje:eng
Publicado: 2020
Materias:
Acceso en línea:https://dx.doi.org/10.1088/1748-0221/15/10/C10025
http://cds.cern.ch/record/2792680
Descripción
Sumario:The second LHC long shutdown period (LS2) is an important opportunity for the CMS Resistive Plate Chambers (RPC) to complete their consolidation and upgrade projects. The consolidation includes detector maintenance for gas tightness, HV (high voltage), LV (low voltage) and slow control operation. All services for the RPC Phase-2 upgrade, namely RE3/1 and RE4/1, were anticipated for installation to LS2. This paper summarises the RPC system maintenance and upgrade activities.