Cargando…
Level 1 muon triggers algorithms for the CMS upgrade at the HL-LHC
In view of the HL-LHC, the Phase-2 CMS upgrade will replace the entire trigger and data acquisition system. The detector readout electronics will be upgraded to allow a maximum L1 output rate of 750 kHz, and a latency of 12.5 $\mu$s. The upgraded system will be entirely running on commercial FPGA pr...
Autor principal: | Ramon Alvarez, Clara |
---|---|
Lenguaje: | eng |
Publicado: |
2021
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.22323/1.398.0764 http://cds.cern.ch/record/2797685 |
Ejemplares similares
-
Muon Track fast Tag : A muon trigger upgrade for CMS at the HL-LHC
por: Pooth, Oliver
Publicado: (2012) -
Level-1 Muon Triggers for the CMS Experiment at the HL-LHC
por: Folgueras, Santiago
Publicado: (2019) -
Level 1 Muon Triggers for the CMS Experiment at the HL-LHC
por: Glazewska, Marianna, et al.
Publicado: (2022) -
The CMS Trigger upgrade for the HL-LHC
por: Fernandez Perez Tomei, Thiago Rafael
Publicado: (2020) -
Overview of the HL-LHC Upgrade for the CMS Level-1 Trigger
por: Bologna, Simone
Publicado: (2019)