Cargando…
Front-end hybrid designs for the CMS Phase-2 upgrade towards the production phase
Sixteen thousand 2S front-end hybrids and twelve thousand PS front-end hybrids will be produced for the CMS Tracker Phase-2 upgrade. The hybrids consist of flip-chips, passives and mechanical components mounted on a flexible substrate, laminated onto carbon-fibre stiffeners with thermal expansion co...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2021
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1088/1748-0221/17/04/C04018 http://cds.cern.ch/record/2797690 |
_version_ | 1780972414317887488 |
---|---|
author | Kovacs, Mark Istvan Blanchot, Georges Gadek, Tomasz Hollos, Adam Erik Mateos Dominguez, Irene Zografos, Angelos |
author_facet | Kovacs, Mark Istvan Blanchot, Georges Gadek, Tomasz Hollos, Adam Erik Mateos Dominguez, Irene Zografos, Angelos |
author_sort | Kovacs, Mark Istvan |
collection | CERN |
description | Sixteen thousand 2S front-end hybrids and twelve thousand PS front-end hybrids will be produced for the CMS Tracker Phase-2 upgrade. The hybrids consist of flip-chips, passives and mechanical components mounted on a flexible substrate, laminated onto carbon-fibre stiffeners with thermal expansion compensators. In the prototyping phase, several critical issues have been solved to manufacture these complex circuits. Final designs are now reaching readiness for the full-scale production. Lessons learned during the prototyping phase and different improvements implemented for manufacturability will be presented in this contribution. |
id | cern-2797690 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2021 |
record_format | invenio |
spelling | cern-27976902022-08-19T13:50:14Zdoi:10.1088/1748-0221/17/04/C04018http://cds.cern.ch/record/2797690engKovacs, Mark IstvanBlanchot, GeorgesGadek, TomaszHollos, Adam ErikMateos Dominguez, IreneZografos, AngelosFront-end hybrid designs for the CMS Phase-2 upgrade towards the production phaseDetectors and Experimental TechniquesSixteen thousand 2S front-end hybrids and twelve thousand PS front-end hybrids will be produced for the CMS Tracker Phase-2 upgrade. The hybrids consist of flip-chips, passives and mechanical components mounted on a flexible substrate, laminated onto carbon-fibre stiffeners with thermal expansion compensators. In the prototyping phase, several critical issues have been solved to manufacture these complex circuits. Final designs are now reaching readiness for the full-scale production. Lessons learned during the prototyping phase and different improvements implemented for manufacturability will be presented in this contribution.CMS-CR-2021-230oai:cds.cern.ch:27976902021-10-23 |
spellingShingle | Detectors and Experimental Techniques Kovacs, Mark Istvan Blanchot, Georges Gadek, Tomasz Hollos, Adam Erik Mateos Dominguez, Irene Zografos, Angelos Front-end hybrid designs for the CMS Phase-2 upgrade towards the production phase |
title | Front-end hybrid designs for the CMS Phase-2 upgrade towards the production phase |
title_full | Front-end hybrid designs for the CMS Phase-2 upgrade towards the production phase |
title_fullStr | Front-end hybrid designs for the CMS Phase-2 upgrade towards the production phase |
title_full_unstemmed | Front-end hybrid designs for the CMS Phase-2 upgrade towards the production phase |
title_short | Front-end hybrid designs for the CMS Phase-2 upgrade towards the production phase |
title_sort | front-end hybrid designs for the cms phase-2 upgrade towards the production phase |
topic | Detectors and Experimental Techniques |
url | https://dx.doi.org/10.1088/1748-0221/17/04/C04018 http://cds.cern.ch/record/2797690 |
work_keys_str_mv | AT kovacsmarkistvan frontendhybriddesignsforthecmsphase2upgradetowardstheproductionphase AT blanchotgeorges frontendhybriddesignsforthecmsphase2upgradetowardstheproductionphase AT gadektomasz frontendhybriddesignsforthecmsphase2upgradetowardstheproductionphase AT hollosadamerik frontendhybriddesignsforthecmsphase2upgradetowardstheproductionphase AT mateosdominguezirene frontendhybriddesignsforthecmsphase2upgradetowardstheproductionphase AT zografosangelos frontendhybriddesignsforthecmsphase2upgradetowardstheproductionphase |