Cargando…
Production and Quality Control of VFAT3 Front-end Hybrids for the CMS GE1/1 Upgrade
The CMS experiment is planning to install Gaseous Electron Multiplier (GEM) chambers as part of the Muon upgrade for High Luminosity Operation at the LHC. The front-end ASIC (VFAT3) has been produced in volume together with its hybrid PCB. This paper describes the design of a custom test bench for t...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2797788 |
_version_ | 1780972436490027008 |
---|---|
author | Irshad, Aamir |
author_facet | Irshad, Aamir |
author_sort | Irshad, Aamir |
collection | CERN |
description | The CMS experiment is planning to install Gaseous Electron Multiplier (GEM) chambers as part of the Muon upgrade for High Luminosity Operation at the LHC. The front-end ASIC (VFAT3) has been produced in volume together with its hybrid PCB. This paper describes the design of a custom test bench for the production Quality Control (QC) of the VFAT3 hybrids. The full QC procedure incorporates calibration and performance measurements, database entries and statistical data analysis. The paper details the optimization of firmware and software functions, reducing the test time per hybrid from 30 to 2 minutes. The test system produced an overall 89$\%$ production yield including the wafer dicing and hybrid assembly losses. |
id | cern-2797788 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2019 |
record_format | invenio |
spelling | cern-27977882021-12-13T20:15:48Zhttp://cds.cern.ch/record/2797788engIrshad, AamirProduction and Quality Control of VFAT3 Front-end Hybrids for the CMS GE1/1 UpgradeDetectors and Experimental TechniquesThe CMS experiment is planning to install Gaseous Electron Multiplier (GEM) chambers as part of the Muon upgrade for High Luminosity Operation at the LHC. The front-end ASIC (VFAT3) has been produced in volume together with its hybrid PCB. This paper describes the design of a custom test bench for the production Quality Control (QC) of the VFAT3 hybrids. The full QC procedure incorporates calibration and performance measurements, database entries and statistical data analysis. The paper details the optimization of firmware and software functions, reducing the test time per hybrid from 30 to 2 minutes. The test system produced an overall 89$\%$ production yield including the wafer dicing and hybrid assembly losses.CMS-CR-2019-220oai:cds.cern.ch:27977882019-10-11 |
spellingShingle | Detectors and Experimental Techniques Irshad, Aamir Production and Quality Control of VFAT3 Front-end Hybrids for the CMS GE1/1 Upgrade |
title | Production and Quality Control of VFAT3 Front-end Hybrids for the CMS GE1/1 Upgrade |
title_full | Production and Quality Control of VFAT3 Front-end Hybrids for the CMS GE1/1 Upgrade |
title_fullStr | Production and Quality Control of VFAT3 Front-end Hybrids for the CMS GE1/1 Upgrade |
title_full_unstemmed | Production and Quality Control of VFAT3 Front-end Hybrids for the CMS GE1/1 Upgrade |
title_short | Production and Quality Control of VFAT3 Front-end Hybrids for the CMS GE1/1 Upgrade |
title_sort | production and quality control of vfat3 front-end hybrids for the cms ge1/1 upgrade |
topic | Detectors and Experimental Techniques |
url | http://cds.cern.ch/record/2797788 |
work_keys_str_mv | AT irshadaamir productionandqualitycontrolofvfat3frontendhybridsforthecmsge11upgrade |