Cargando…

Production and Quality Control of VFAT3 Front-end Hybrids for the CMS GE1/1 Upgrade

The CMS experiment is planning to install Gaseous Electron Multiplier (GEM) chambers as part of the Muon upgrade for High Luminosity Operation at the LHC. The front-end ASIC (VFAT3) has been produced in volume together with its hybrid PCB. This paper describes the design of a custom test bench for t...

Descripción completa

Detalles Bibliográficos
Autor principal: Irshad, Aamir
Lenguaje:eng
Publicado: 2019
Materias:
Acceso en línea:http://cds.cern.ch/record/2797788
_version_ 1780972436490027008
author Irshad, Aamir
author_facet Irshad, Aamir
author_sort Irshad, Aamir
collection CERN
description The CMS experiment is planning to install Gaseous Electron Multiplier (GEM) chambers as part of the Muon upgrade for High Luminosity Operation at the LHC. The front-end ASIC (VFAT3) has been produced in volume together with its hybrid PCB. This paper describes the design of a custom test bench for the production Quality Control (QC) of the VFAT3 hybrids. The full QC procedure incorporates calibration and performance measurements, database entries and statistical data analysis. The paper details the optimization of firmware and software functions, reducing the test time per hybrid from 30 to 2 minutes. The test system produced an overall 89$\%$ production yield including the wafer dicing and hybrid assembly losses.
id cern-2797788
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2019
record_format invenio
spelling cern-27977882021-12-13T20:15:48Zhttp://cds.cern.ch/record/2797788engIrshad, AamirProduction and Quality Control of VFAT3 Front-end Hybrids for the CMS GE1/1 UpgradeDetectors and Experimental TechniquesThe CMS experiment is planning to install Gaseous Electron Multiplier (GEM) chambers as part of the Muon upgrade for High Luminosity Operation at the LHC. The front-end ASIC (VFAT3) has been produced in volume together with its hybrid PCB. This paper describes the design of a custom test bench for the production Quality Control (QC) of the VFAT3 hybrids. The full QC procedure incorporates calibration and performance measurements, database entries and statistical data analysis. The paper details the optimization of firmware and software functions, reducing the test time per hybrid from 30 to 2 minutes. The test system produced an overall 89$\%$ production yield including the wafer dicing and hybrid assembly losses.CMS-CR-2019-220oai:cds.cern.ch:27977882019-10-11
spellingShingle Detectors and Experimental Techniques
Irshad, Aamir
Production and Quality Control of VFAT3 Front-end Hybrids for the CMS GE1/1 Upgrade
title Production and Quality Control of VFAT3 Front-end Hybrids for the CMS GE1/1 Upgrade
title_full Production and Quality Control of VFAT3 Front-end Hybrids for the CMS GE1/1 Upgrade
title_fullStr Production and Quality Control of VFAT3 Front-end Hybrids for the CMS GE1/1 Upgrade
title_full_unstemmed Production and Quality Control of VFAT3 Front-end Hybrids for the CMS GE1/1 Upgrade
title_short Production and Quality Control of VFAT3 Front-end Hybrids for the CMS GE1/1 Upgrade
title_sort production and quality control of vfat3 front-end hybrids for the cms ge1/1 upgrade
topic Detectors and Experimental Techniques
url http://cds.cern.ch/record/2797788
work_keys_str_mv AT irshadaamir productionandqualitycontrolofvfat3frontendhybridsforthecmsge11upgrade